Subcontract
Contract Template for New Zealand

New Zealand construction subcontract with identified main-contract interfaces, Construction Contracts Act claims and retentions, safety, variations, completion and defects terms.

Governing law: New ZealandPublished templateUpdated 2026-10-09
SUBCONTRACT
# SUBCONTRACT *New Zealand* Date: [date]. Main Contractor: [full legal name, constitution, NZBN/company number and address] (Main Contractor). Subcontractor: [full legal name, constitution, NZBN/company number and address] (Subcontractor). The Project is [project] for [principal] at [address] (Site). The Subcontract Works are the work described in Schedule 1. Subcontract Price means NZD [amount] plus GST or the rates and measurements in Schedule 2. Completion Date means [date]. Completion has the meaning in clause 7. Main Contract means only the identified documents and obligations listed in Schedule 1. Variation means a change authorised under clause 5. Working Day has the meaning given in the Construction Contracts Act 2002. ## 1. Subcontract Works and Main Contract interface The Subcontractor must execute, complete and correct the Subcontract Works with reasonable skill and care, using suitable labour, materials, equipment and supervision, in accordance with this Subcontract, the specifications in Schedule 1, the consented documents, the New Zealand Building Code and other applicable law. It must verify dimensions reasonably capable of verification and promptly notify an inconsistency, unsafe instruction or apparent error before acting. Only Main Contract provisions reproduced or precisely identified in Schedule 1 bind the Subcontractor, and only to the extent relevant to the Subcontract Works and not inconsistent with this Subcontract. The Subcontractor is not taken to know undisclosed Main Contract terms. No term creates a contract between the Subcontractor and the principal. ## 2. Main Contractor obligations and coordination The Main Contractor must provide lawful Site access, approved information, setting-out data, interfaces with other contractors, available programme information and Main Contractor-supplied items by the dates in Schedule 1. It must coordinate the Subcontract Works with the Project and give the Subcontractor reasonable opportunity to perform. A Site direction within the existing scope must be obeyed if lawful. A direction changing scope, quality, sequence, quantity or timing is a proposed Variation and must follow clause 5. ## 3. Consents, safety and personnel Schedule 1 must allocate responsibility for consents, inspections and producer statements affecting the Subcontract Works. The affected work must not begin before a required approval is in place. Each party must comply with duties under the Health and Safety at Work Act 2015 and consult, co-operate and co-ordinate with other duty holders. The Subcontractor controls its methods and personnel, maintains competent supervision and work records, follows the lawful Site safety plan, protects completed work and removes waste. No term transfers or limits a statutory duty. The Subcontractor may use lower-tier subcontractors only with consent, remains responsible for them and may not subcontract the whole Subcontract Works. ## 4. Payment claims and retentions The Subcontractor may serve payment claims under section 20 of the Construction Contracts Act 2002 at the intervals or milestones in Schedule 2. Each claim must identify the relevant period and Subcontract Works, calculate the claimed amount, state the due date and include the prescribed explanation. Within [10] Working Days after service, the Main Contractor must pay the claimed amount or serve a payment schedule complying with section 21 that states the scheduled amount and reasons for each difference. Payment is due [20] Working Days after service unless Schedule 2 lawfully states another date. Payment is not conditional on the Main Contractor receiving payment from the principal. Conditional payment provisions have no effect to the extent prohibited by the Act. Any retention must be stated in Schedule 2. Where subpart 2A of the Construction Contracts Act 2002 applies, retention money is trust money and the retaining party must keep, use, account for, report on and pay it only as that Act permits. Release conditions cannot override mandatory law. ## 5. Variations A Variation is valid only when a written instruction or agreement states the changed work, valuation basis, programme effect and revised Completion Date. If price is not agreed before work proceeds, the Subcontract Works are valued using Schedule 2 rates or, if none, reasonable verified cost plus [percentage]% overhead and profit. Urgent protective work may proceed with prompt notice and records. ## 6. Programme and extension of time The Subcontractor must start on [date], follow the Schedule 1 programme and notify a delaying event within [three] Working Days after awareness, with particulars and mitigation within [seven] further Working Days. The Completion Date extends to the extent delay results from an approved Variation, Main Contractor default, late access or information, interference by others, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control despite mitigation. Delay damages stated in Schedule 2 apply only to Subcontractor-caused delay after the Completion Date, at the stated daily amount and cap, subject to the law on penalties. ## 7. Inspection, completion and defects The Main Contractor may inspect without unreasonably disrupting work. The Subcontractor must correct non-conforming work for which it is responsible. Within [five] Working Days after a completion request, the Main Contractor must issue a completion certificate or a reasonable list of material defects or incomplete items. Minor items not preventing intended use do not justify refusal. At completion, the Subcontractor must provide tests, producer statements, as-built information, manuals and warranties allocated in Schedule 1. It must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Completion, incorporation into the Project or payment does not waive latent defects, fraud or mandatory rights. ## 8. Materials, risk and insurance The Subcontractor bears risk in the Subcontract Works until completion except to the extent caused by the Main Contractor or others under its control. Title to materials passes on payment or incorporation into the Project, whichever occurs first, free of undisclosed security interests. Before starting, the Subcontractor must provide evidence of the contract works, public liability and other insurance stated in Schedule 3. Insurance does not limit responsibility. ## 9. Suspension and termination The Subcontractor may exercise statutory suspension rights for non-payment and may suspend affected work after [seven] Working Days' notice of another uncured material breach. Either party may suspend immediately for imminent safety risk. A party may terminate for a material breach remaining uncured [fifteen] Working Days after notice or insolvency, subject to mandatory law. On termination, the Subcontractor must make its work area safe and hand over paid-for work, materials and records. The Main Contractor must pay for conforming work, verified materials and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Subcontractor default. ## 10. Liability, disputes and general Each party is liable for direct loss caused by breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any cap is stated in Schedule 3. Representatives must meet within [five] Working Days after a dispute notice. Either party may refer a dispute to adjudication under the Construction Contracts Act 2002 at any time. Other statutory or court remedies remain available. New Zealand law governs and its courts have jurisdiction. Amendments must be signed. Notices must be written and served consistently with statutory requirements and Schedule 3. Counterparts and electronic signatures may be used where the Contract and Commercial Law Act 2017 permits. ## SCHEDULE 1 — PROJECT, SUBCONTRACT WORKS AND PROGRAMME Site, Project and principal: [details]. Subcontract Works, drawings, specifications and exclusions: [details]. Identified Main Contract documents and relevant obligations: [details]. Main Contractor inputs, interfaces and supplied items: [details]. Programme, Completion Date and completion criteria: [details]. Consents, inspections, producer statements and responsible party: [details]. ## SCHEDULE 2 — PRICE, MEASUREMENT AND CLAIMS Lump sum or rates and quantities: [details]. Claim intervals, calculations and evidence: [details]. Payment-schedule period and due date: [details]. Variation rates and overhead/profit percentage: [details]. Retention and release: [details or none]. Delay damages, if agreed: [details]. ## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Main Contractor: [authorised signatory, position, signature and date]. For the Subcontractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for New Zealand