February AIContract Templates

New Zealand · Business & partnerships

Design and Build Contract
Contract Template for New Zealand

New Zealand integrated design-and-build contract preserving statutory payment claims, retentions and adjudication while allocating design, consent and completion responsibility.

Governing law: New ZealandPublished templateUpdated 2026-10-09
DESIGN AND BUILD CONTRACT
# DESIGN AND BUILD CONTRACT *New Zealand* Date: [date]. Principal: [full legal name, constitution, NZBN/company number and address] (Principal). Design and Build Contractor: [full legal name, constitution, NZBN/company number and address] (Contractor). The Project is the non-residential design and construction of [building/facility] at [address] (Site). The Works are the design, construction, testing and handover described in Schedule 1. Contract Price means NZD [amount] plus GST, adjusted only under this Contract. Completion Date means [date]. Completion has the meaning in clause 7. Variation means a change authorised under clause 5. Working Day has the meaning given in the Construction Contracts Act 2002. ## 1. Integrated design and construction The Contractor must design and complete the Works with reasonable skill and care so that they comply with this Contract, the Principal's requirements and performance criteria in Schedule 1, the building consent, the New Zealand Building Code and other applicable law. This Contract, signed Variations, Schedule 1, Schedule 2 and the accepted Contractor proposal listed in Schedule 1 govern in that order if they conflict. The Contractor is responsible for integrating its design and construction and coordinating designers, subcontractors and suppliers. It must promptly notify an error, ambiguity, unsafe requirement or missing interface that a competent design-and-build contractor should identify. It may rely on Principal information expressly identified in Schedule 1 but must verify Site conditions and dimensions reasonably capable of verification. ## 2. Principal inputs, consents and review The Principal must provide lawful Site access, authority to build, decisions, Principal information and supplied items by the dates in Schedule 1. Schedule 1 must allocate responsibility for building consent, resource consent, utility approvals, inspections and code compliance certification. The responsible party must obtain an approval before the affected work begins. The Contractor must submit designs and samples identified in Schedule 1. A Principal or Contract Administrator review does not transfer design responsibility, authorise a deviation or amend this Contract. Each party remains responsible for duties imposed on it by law. ## 3. Site, safety and quality The Contractor controls its methods and workforce and must maintain competent supervision, a quality plan, inspection records and protection of the Site and adjoining property. Each party must comply with duties under the Health and Safety at Work Act 2015 and consult, co-operate and co-ordinate with other duty holders. No term transfers or limits a statutory duty. The Contractor remains responsible for subcontractors and may not subcontract the whole Works without the Principal's consent. ## 4. Payment claims and retentions The Contractor may serve payment claims under section 20 of the Construction Contracts Act 2002 at the milestones or intervals in Schedule 2. Each claim must identify the relevant period and Works, calculate the claimed amount, state the due date and include the prescribed explanation. Within [10] Working Days after service, the Principal must pay the claimed amount or serve a payment schedule complying with section 21 that states the scheduled amount and reasons for each difference. Payment is due [20] Working Days after service unless Schedule 2 lawfully states another date. Statutory consequences, suspension and adjudication rights remain available. Any retention must be stated in Schedule 2. To the extent subpart 2A of the Construction Contracts Act 2002 applies, retention money is trust money and the retaining party must keep, use, account for, report on and pay it only as that Act permits. Release conditions cannot override mandatory law. ## 5. Variations A Variation must be in writing and state the changed requirement or work, valuation method, programme effect and revised Completion Date. The Contractor need not perform a proposed Variation until those matters are agreed, except urgent work reasonably required to prevent imminent injury or material damage. For urgent work, it must notify the Principal promptly and keep records. If price is not agreed before work proceeds, it is determined using applicable Schedule 2 rates or, if none, reasonable verified cost plus [percentage]% overhead and profit. ## 6. Programme and extension of time The Contractor must maintain the programme in Schedule 1 and notify a delaying event within [three] Working Days after awareness, with particulars and mitigation within [seven] further Working Days. The Completion Date extends to the extent completion is delayed by an approved Variation, Principal default, late access or information, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control despite mitigation. Delay damages in Schedule 2 apply only to Contractor-caused delay after the Completion Date, at the stated daily amount and cap, subject to the law on penalties. ## 7. Testing, completion and defects The Contractor must give reasonable notice of tests and provide results. Completion occurs when the Works meet the Schedule 1 completion criteria, required Contractor approvals have been obtained, the Works are safe and fit for intended use, and only minor items not preventing that use remain. Within [five] Working Days after a completion request, the Principal must certify completion or give a reasonable list of material non-compliance. At completion, the Contractor must deliver as-built drawings, producer statements, warranties, test records, manuals and consent records required by Schedule 1. It must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Certification, occupation or final payment does not waive latent defects, fraud or mandatory rights. ## 8. Intellectual property, risk and insurance The Contractor retains intellectual property in its design documents but grants the Principal a perpetual, royalty-free, transferable licence to use and adapt them to complete, occupy, operate, maintain, repair and alter the Project. It must have authority to grant that licence. The Principal grants a limited licence to use Principal materials only for the Works. The Contractor bears risk in the Works until completion except to the extent caused by the Principal. Title to materials passes on payment or incorporation, whichever occurs first, free of undisclosed security interests. Before starting, the Contractor must provide evidence of the professional indemnity, contract works, public liability and other insurance in Schedule 3. ## 9. Suspension and termination A party may suspend affected performance after [seven] Working Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. Statutory suspension rights remain available. A party may terminate for a material breach remaining uncured [fifteen] Working Days after notice or the other party's insolvency, subject to mandatory law. On termination, the Contractor must make the Site safe and hand over paid-for work, materials and records. The Principal must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. ## 10. Liability, disputes and general Each party is liable for direct loss caused by breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any cap is stated in Schedule 3. Representatives must meet within [five] Working Days after a dispute notice. Either party may refer a dispute to adjudication under the Construction Contracts Act 2002 at any time. Other statutory or court remedies remain available. New Zealand law governs and its courts have jurisdiction. Amendments must be signed. Notices must be written and served consistently with statutory requirements and Schedule 3. Counterparts and electronic signatures may be used where the Contract and Commercial Law Act 2017 permits. ## SCHEDULE 1 — PROJECT, DESIGN AND PROGRAMME Site and Principal's authority to build: [details]. Principal requirements, performance criteria, exclusions and accepted proposal: [details]. Principal information and reliance items: [details]. Design submissions, review periods and key personnel: [details]. Programme, Completion Date and dependencies: [details]. Consents, inspections and responsible party: [details]. Tests, completion criteria and handover records: [details]. ## SCHEDULE 2 — PRICE, CLAIMS AND RETENTIONS Contract Price and GST: [details]. Claim intervals, calculations and evidence: [details]. Payment-schedule period and due date: [details]. Variation rates and overhead/profit percentage: [details]. Retention and release: [details or none]. Delay damages, if agreed: [details]. ## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Principal: [authorised signatory, position, signature and date]. For the Contractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for New Zealand