February AIContract Templates

New Zealand · Business & partnerships

Interior Works Agreement
Contract Template for New Zealand

New Zealand commercial interior-works template with Building Code, consent, health-and-safety, payment-claim, retention, variation, completion and defect provisions.

Governing law: New ZealandPublished templateUpdated 2026-10-10
INTERIOR WORKS AGREEMENT
# INTERIOR WORKS AGREEMENT *New Zealand* Date: [date]. Principal: [full legal name, constitution, NZBN or company number and address] (Principal). Contractor: [full legal name, constitution, NZBN or company number and address] (Contractor). The Site is the completed non-residential premises at [address] described in Schedule 1. The Interior Works are the fit-out, finishes, fixtures and related building services expressly described in Schedule 1. Contract Price means NZD [amount] plus GST, adjusted only under this Agreement. Completion Date means [date]. Completion has the meaning in clause 8. Variation means a change authorised under clause 6. Working Day has the meaning in the Construction Contracts Act 2002. ## 1. Interior Works The Contractor must complete and remedy the Interior Works with reasonable skill and care in accordance with this Agreement, the consented documents, New Zealand Building Code, approved specifications and lawful Site rules. Structural work, change of use and work to base-building fire, electrical, plumbing or mechanical systems are excluded unless Schedule 1 expressly includes them and allocates the necessary consent and design responsibility. The Contractor must verify visible dimensions and conditions reasonably capable of verification before fabrication. It must promptly notify a conflict, unsafe condition or apparent error and must not cover affected work before required inspection. ## 2. Principal inputs and consents The Principal must provide lawful access, landlord or occupier approval, existing-building information, utilities and decisions by the dates in Schedule 1. Schedule 1 must allocate responsibility for building consent, resource consent, fire and electrical approvals, inspections and code compliance certification. The responsible party must obtain approval before affected work begins. A Principal or contract-administrator review does not transfer design responsibility, approve a departure or relieve the Contractor of compliance. Each party remains responsible for statutory duties imposed on it. ## 3. Site safety and personnel Each party must comply with the Health and Safety at Work Act 2015 and consult, co-operate and co-ordinate with other duty holders. The Contractor controls its work methods and personnel, maintains competent supervision and site records, isolates hazards, protects occupants and adjoining property, and follows the lawful Site safety plan. The Contractor remains responsible for subcontractors and may not subcontract the whole Interior Works without consent. It must keep the Site secure and remove waste regularly. ## 4. Payment claims and retentions The Contractor may serve payment claims under section 20 of the Construction Contracts Act 2002 at the milestones or intervals in Schedule 2. Each claim must identify the relevant period and Interior Works, calculate the claimed amount, state the due date and include the prescribed explanation. Within [10] Working Days after service, the Principal must pay the claimed amount or serve a payment schedule complying with section 21 that states the scheduled amount and reasons for each difference. Payment is due [20] Working Days after service unless Schedule 2 lawfully states another date. Statutory payment, suspension and adjudication rights remain available. Any retention must be stated in Schedule 2. Where subpart 2A of the Construction Contracts Act 2002 applies, retention money is trust property and the Principal must keep, use, account for, report on and pay it only as that Act permits. ## 5. Materials, title and risk The Contractor must use new conforming materials unless Schedule 1 permits otherwise, provide samples and certificates where required, and must not substitute a specified item without an approved Variation. Title to paid materials passes to the Principal on payment or incorporation, whichever occurs first, free of undisclosed security interests. Risk in the Interior Works remains with the Contractor until Completion except to the extent caused by the Principal or a person under its control. ## 6. Variations and Site conditions A Variation is effective only when a written instruction or agreement states the changed work, valuation basis, programme effect and revised Completion Date. If price is not agreed before work proceeds, it is determined using applicable Schedule 2 rates or, if none, reasonable verified cost plus [percentage]% overhead and profit. Urgent work reasonably required to prevent imminent injury or material damage may proceed with prompt notice and records. If the Contractor encounters a concealed condition materially different from reliable Site information in Schedule 1 and not reasonably discoverable before signing, it must protect the area and notify the Principal before disturbance. Any adjustment follows the Variation process. ## 7. Programme and delay The Contractor must start on [date], follow the Schedule 1 programme and notify a delaying event within [three] Working Days after awareness, with particulars and mitigation within [seven] further Working Days. The Completion Date extends to the extent completion is delayed by an approved Variation, Principal default, late access or information, a qualifying concealed condition, or an unavoidable event beyond reasonable control despite mitigation. Delay damages in Schedule 2 apply only to Contractor-caused delay after the Completion Date, at the stated daily amount and cap, subject to the law on penalties. ## 8. Completion and defects Completion occurs when the Interior Works meet the Schedule 1 criteria, required Contractor approvals and producer statements are obtained, the premises are safe and fit for the intended use, waste is removed, and only minor items not preventing use remain. Within [five] Working Days after a completion request, the Principal must certify Completion or give a reasonable list of material non-compliance. The Contractor must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Occupation, certification or final payment does not waive latent defects, fraud or mandatory rights. ## 9. Insurance, suspension and termination Before starting, the Contractor must provide evidence of contract works, public liability and other insurance stated in Schedule 3. Insurance does not limit responsibility. A party may suspend affected performance after [seven] Working Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. Statutory suspension rights remain available. A party may terminate for material breach remaining uncured [fifteen] Working Days after notice or for insolvency, subject to mandatory law. On termination, the Contractor must make the Site safe and hand over paid-for work, materials, warranties and records. The Principal must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. ## 10. Liability, disputes and general Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No exclusion applies to fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any cap is stated in Schedule 3. Representatives must meet within [five] Working Days after a dispute notice. Either party may refer a dispute to adjudication under the Construction Contracts Act 2002 at any time. Other statutory or court remedies remain available. New Zealand law governs and its courts have jurisdiction. Changes must be signed. Notices must be served consistently with statutory requirements and Schedule 3. Counterparts and electronic signatures may be used where the Contract and Commercial Law Act 2017 permits. ## SCHEDULE 1 SITE, INTERIOR WORKS AND PROGRAMME Site, access, intended use and landlord approval: [details]. Drawings, specifications, exclusions and reliance information: [details]. Consents, inspections, producer statements and responsible party: [details]. Programme, Completion Date and Completion criteria: [details]. ## SCHEDULE 2 PRICE, CLAIMS AND RETENTIONS Contract Price and GST: [details]. Claim intervals, payment-schedule period and due date: [details]. Variation rates; retention and release: [details or none]. Delay damages and cap: [details or none]. ## SCHEDULE 3 INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Principal: [authorised signatory, position, signature and date]. For the Contractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for New Zealand