Turnkey Contract
Contract Template for India

Indian turnkey contract for delivery of a complete ready-for-use facility or system, including design, supply, installation, commissioning, training and handover.

Governing law: IndiaPublished templateUpdated 2026-10-09
TURNKEY CONTRACT
# TURNKEY CONTRACT *India* Date: [date]. Purchaser: [full legal name, constitution, registration number and address] (Purchaser). Turnkey Contractor: [full legal name, constitution, registration number and address] (Contractor). The Asset is [facility/system] to be delivered ready for safe intended use at [address, State/Union Territory] (Site). The Turnkey Works are all design, procurement, construction, installation, commissioning, training and handover obligations in Schedule 1. Turnkey Price means INR [amount], adjusted only under this Contract. Required Handover Date means [date]. Handover has the meaning in clause 8. Variation means a change authorised under clause 6. Business Day means a day other than Saturday, Sunday or public holiday at the Site. ## 1. Ready-for-use obligation The Contractor must deliver the complete Asset so that it is safe, operable and capable of the functions, output and performance stated in Schedule 1. Except for Purchaser items and exclusions expressly listed there, the Turnkey Price includes everything reasonably necessary for that result, including interfaces, consumables for testing, temporary works, commissioning, initial spares, manuals and training. The Contractor must perform with reasonable skill and care, comply with applicable law, approved plans and lawful instructions, and coordinate designers, vendors and subcontractors. It must promptly warn of an error, ambiguity, unsafe requirement or missing interface that a competent turnkey contractor should identify. It may rely only on Purchaser information identified as a reliance item in Schedule 1. ## 2. Purchaser obligations and approvals The Purchaser must provide lawful Site access, authority to install and operate the Asset, Purchaser-supplied utilities, inputs and decisions by the dates in Schedule 1. Schedule 1 must allocate planning, building, environmental, fire, utility, import, inspection, completion and operating approvals. The responsible party must obtain each approval before the affected activity. A Purchaser review or attendance at a test does not transfer the Contractor's responsibility or approve a deviation. Nothing transfers or limits a statutory duty imposed on either party. ## 3. Personnel, Site and safety The Contractor controls its methods, personnel and Site safety. It must comply with applicable labour, contract-labour, construction-worker welfare, environmental and safety law; obtain required registrations and licences; keep Site records; protect property; and provide competent supervision. It remains responsible for all subcontractors and suppliers and may not subcontract the whole Turnkey Works without consent. ## 4. Turnkey Price and payment The Purchaser must pay the Turnkey Price at the milestones in Schedule 2. Each invoice must identify the achieved milestone, approved Variations, GST, tax deduction at source, allocated customs or other taxes and required evidence. Within [seven] Business Days after receipt, the Purchaser must pay the undisputed amount or state in writing each disputed item and reason. Any advance, retention, performance security, advance-payment security or warranty security must be stated in Schedule 2 with its amount, form, reduction, release and expiry. If the Contractor is an eligible micro or small enterprise, nothing reduces its statutory payment and interest rights. ## 5. Design, procurement and documents The Contractor must prepare and control the drawings, calculations, specifications, software configurations, quality records and vendor documents in Schedule 1. It must procure new and conforming equipment unless Schedule 1 states otherwise, conduct required inspections and provide title free of undisclosed security interests. Title passes on payment or delivery to the Site, whichever occurs first, while risk remains with the Contractor until Handover except to the extent caused by the Purchaser. The Contractor retains intellectual property in its documents but grants the Purchaser a perpetual, royalty-free, transferable licence to use and adapt them to operate, maintain, repair and alter the Asset. It must have authority to grant that licence. ## 6. Variations and concealed conditions A Variation is effective only when signed by authorised representatives and states the changed output or work, Turnkey Price adjustment, time effect, performance effect and revised Required Handover Date. The Contractor need not perform a proposed Variation before agreement, except urgent protective work reasonably required to prevent imminent injury or material damage. It must notify promptly and keep records. If the Contractor encounters a physical condition materially different from reliable Site information in Schedule 1 and not reasonably discoverable before signing, it must protect the work and notify the Purchaser before disturbing the condition. Any adjustment requires a Variation. ## 7. Time and delay The Contractor must maintain a programme covering design, manufacture, transport, installation, commissioning, training and Handover. It must notify a likely delay within [three] Business Days after awareness and provide particulars and mitigation within [seven] further Business Days. The Required Handover Date extends only to the extent delay results from an approved Variation, Purchaser default, late access or input, a qualifying concealed condition, or an unavoidable event beyond reasonable control despite mitigation. Delay damages stated in Schedule 2 apply only to Contractor-caused delay after that date, at the stated daily amount and cap, to the extent enforceable as reasonable compensation and not a penalty. ## 8. Commissioning and Handover The Contractor must commission the Asset and perform the reliability and performance tests in Schedule 1 with reasonable notice to the Purchaser. Handover occurs when the Asset passes the required tests, is ready for safe intended use, required Contractor approvals are obtained, operators have received the agreed training and essential manuals, spares, warranties and as-built records are delivered. Within [five] Business Days after a Handover request, the Purchaser must issue a Handover Certificate or a reasonable list of material failures. Minor items not preventing safe intended use may be listed for prompt completion. If a performance result is below a guaranteed value but at or above the minimum acceptance level, acceptance requires the adjustment stated in Schedule 2; a result below the minimum level requires correction or a signed Variation. The Contractor must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Warranty Period. Handover, operation or final payment does not waive latent defects, fraud or mandatory rights. ## 9. Insurance, suspension and termination Before starting, the Contractor must provide evidence of the transit, erection or contract works, worker, third-party liability and professional indemnity insurance in Schedule 3. Insurance does not limit responsibility. A party may suspend affected performance after [seven] Business Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. A party may terminate for a material breach remaining uncured [fifteen] Business Days after notice or insolvency, subject to mandatory law. On termination, the Contractor must secure the Site and hand over paid-for equipment, work and records. The Purchaser must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. ## 10. Liability, disputes and general Each party is liable for direct loss caused by breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any liability cap is stated in Schedule 3. Senior representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction. Amendments must be signed. Notices must be written and delivered by hand, tracked post or email to Schedule 3, effective on proven receipt. Counterparts and valid electronic signatures may be used. Applicable State or Union Territory stamp-duty and execution requirements must be completed. ## SCHEDULE 1 — ASSET AND TURNKEY REQUIREMENTS Site, Asset, intended use, interfaces and exclusions: [details]. Output, capacity, efficiency and guaranteed performance: [details]. Minimum acceptance levels and test methods: [details]. Purchaser inputs, utilities and reliance items: [details]. Programme and Required Handover Date: [details]. Approvals, inspections and responsible party: [details]. Training, manuals, spares, warranties and handover records: [details]. ## SCHEDULE 2 — PRICE, PAYMENTS AND ADJUSTMENTS Turnkey Price, GST, customs and TDS allocation: [details]. Milestones, amounts and evidence: [details]. Advances, retentions and securities: [details or none]. Delay damages and performance adjustments: [details]. ## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Purchaser: [authorised signatory, position, signature and date]. For the Contractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for India