Interior Works Agreement
Contract Template for India

India commercial interior fit-out template covering approved drawings, access, permits, variations, milestones, safety, completion, defects, GST and State execution requirements.

Governing law: IndiaPublished templateUpdated 2026-10-10
INTERIOR WORKS AGREEMENT
# INTERIOR WORKS AGREEMENT *India* Date: [date]. Place of execution: [city and State or Union Territory]. Employer: [full legal name, constitution, registration number, GSTIN and address] (Employer). Contractor: [full legal name, constitution, registration number, GSTIN and address] (Contractor). The Premises are the completed commercial premises at [address] described in Schedule 1. The Works are the non-structural interior fit-out, finishes, fixtures and associated services expressly described in Schedule 1. The Contract Price is INR [amount], adjusted only under this Agreement. Completion Date means [date]. Completion has the meaning in clause 8. Variation means a change authorised under clause 6. Business Day means a day other than Sunday or a public holiday at the Premises. ## 1. Scope and standard The Contractor must execute, complete and correct the Works with reasonable skill and care in accordance with this Agreement, the approved drawings and specifications in Schedule 1, applicable law, manufacturer requirements and lawful Site rules. The Works exclude structural alteration, change of use and work to base-building fire, electrical, plumbing or mechanical systems unless Schedule 1 expressly includes it and allocates the required approval. The Contractor must verify dimensions and visible conditions reasonably capable of verification before fabrication. It must promptly notify any conflict, unsafe condition or apparent error and must not conceal affected work before instruction. ## 2. Employer inputs and approvals The Employer must provide lawful access, landlord or occupier consent, base-building information, utilities and decisions by the dates in Schedule 1. Schedule 1 must allocate responsibility for municipal permissions, fire approvals, electrical approvals, building or occupancy permissions and any landlord deposit or access charge. The responsible party must obtain an approval before affected work begins. An Employer review, inspection or approval does not relieve the Contractor of responsibility for its methods, workmanship or compliance. The Contractor may rely only on Employer information identified in Schedule 1 as a reliance item. ## 3. Personnel, safety and protection The Contractor controls its methods, personnel and site safety. It must maintain required registrations, licences, worker records and welfare facilities; comply with applicable labour, construction-worker, fire, environmental and safety law; protect occupants, common areas and adjoining property; and keep the Premises reasonably clean and secure. Each party remains responsible for statutory duties imposed on it. The Contractor remains responsible for subcontractors and may not subcontract the whole Works without consent. ## 4. Price and payment The Employer must pay the Contract Price at the milestones in Schedule 2. Each invoice must identify completed work, approved Variations, GST, tax deduction at source and supporting measurements or certificates. Within [seven] Business Days after receipt, the Employer must pay the undisputed amount or give written reasons for each disputed item. Only a reasonably disputed amount may be withheld. Schedule 2 must state whether the Contractor is a micro or small enterprise, its Udyam registration, any retention, advance or performance security, and the release events. Nothing in this Agreement limits mandatory payment, interest or remedy rights under the Micro, Small and Medium Enterprises Development Act 2006. ## 5. Materials and title The Contractor must use new conforming materials unless Schedule 1 permits otherwise, provide samples where required and keep invoices, test certificates and warranties. It must not substitute a specified material without an approved Variation. Title to paid materials passes to the Employer on payment or incorporation, whichever occurs first, free of undisclosed security interests. Risk in the Works remains with the Contractor until Completion except to the extent loss is caused by the Employer or a person under its control. ## 6. Variations and concealed conditions A Variation is effective only when authorised representatives sign a document stating the changed work, price or valuation method, programme effect and revised Completion Date. The Contractor need not perform a proposed Variation before agreement, except urgent work reasonably required to prevent imminent injury or material damage; it must notify the Employer promptly and keep records. If a concealed physical condition materially differs from reliable information in Schedule 1 and was not reasonably discoverable before signing, the Contractor must stop affected work, protect the Premises and notify the Employer before disturbance. Any adjustment requires a Variation. ## 7. Time and delay The Contractor must start on [date], follow the programme in Schedule 1 and notify a likely delay within [three] Business Days after awareness, stating cause, expected effect and mitigation. The Completion Date extends only to the extent completion is delayed by an approved Variation, Employer default, late access or information, a qualifying concealed condition, or an unavoidable event beyond reasonable control despite mitigation. Delay damages in Schedule 2 apply only to Contractor-caused delay after the Completion Date, at the stated daily amount and cap, to the extent enforceable as reasonable compensation and not a penalty. ## 8. Inspection, Completion and defects The Contractor must give reasonable notice of tests and provide results. Completion occurs when the Works meet the Schedule 1 criteria, required Contractor approvals and certificates have been obtained, the Premises are safe and fit for the intended use, waste is removed, and only minor items not preventing use remain. Within [five] Business Days after a completion request, the Employer must issue a completion certificate or a reasonable list of material non-compliance. The Contractor must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Occupation, certification or final payment does not waive latent defects, fraud or mandatory rights. ## 9. Insurance, suspension and termination Before starting, the Contractor must provide evidence of the contract-works, worker and third-party liability insurance stated in Schedule 3. Insurance does not limit responsibility. A party may suspend affected performance after [seven] Business Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. A party may terminate for a material breach remaining uncured [fifteen] Business Days after notice or for insolvency, subject to mandatory law. On termination, the Contractor must make the Premises safe and hand over paid-for work, materials, warranties and records. The Employer must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. ## 10. Liability and general Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No exclusion applies to fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any liability cap is stated in Schedule 3. Representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory forums, courts at [city, State or Union Territory] have exclusive jurisdiction. Changes must be signed. Notices must be delivered by hand, registered post or email to Schedule 3 and take effect on proven receipt. Counterparts and reliable electronic signatures may be used where lawful. The parties must complete applicable State or Union Territory stamp-duty, execution and registration requirements. ## SCHEDULE 1 PREMISES, WORKS AND PROGRAMME Premises, access and intended use: [details]. Drawings, specifications, exclusions and reliance items: [details]. Employer inputs, responsible approvals and dates: [details]. Programme, Completion Date and completion criteria: [details]. ## SCHEDULE 2 PRICE AND PAYMENT Contract Price, GST and TDS allocation: [details]. Milestones, evidence, retention and release: [details or none]. Variation rates; delay damages and cap: [details or none]. Contractor MSME/Udyam status: [details]. ## SCHEDULE 3 INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notice details: [details]. ## SIGNATURES For the Employer: [authorised signatory, office, signature and date]. For the Contractor: [authorised signatory, office, signature and date]. Witnesses if required: [names, addresses, signatures and dates].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for India