Commercial Construction Contract
Contract Template for India

Indian commercial construction contract with project administration, valuation, security, extensions, testing, completion and defects provisions.

Governing law: IndiaPublished templateUpdated 2026-10-09
COMMERCIAL CONSTRUCTION CONTRACT
COMMERCIAL CONSTRUCTION CONTRACT India Date: [date]. Principal: [full legal name, constitution, registration number and address] (Principal). Contractor: [full legal name, constitution, registration number and address] (Contractor). Project means the commercial premises described in Schedule 1 at [site address] (Site). Works means constructing the Project to the Principal's listed design and specifications. Contract Price means INR [amount], adjusted only under this Contract. Completion Date means [date]. This Contract excludes public procurement and residential consumer construction. 1. Project delivery The Contractor must mobilise, execute, test and complete the Works with reasonable skill and care, in accordance with Schedule 1, approved drawings, applicable law and lawful instructions of the Contract Administrator named in Schedule 3. The Contractor must provide the labour, materials, plant, temporary works, supervision and coordination allocated to it. It remains responsible for construction methods and temporary works but not for the adequacy of a Principal-supplied design except for an apparent error it fails to report. The Principal must provide lawful Site access, design information, decisions, interfaces and Principal-supplied items by the dates in Schedule 1. The Contract Administrator may certify but may not amend this Contract unless expressly authorised. 2. Approvals, compliance and Site management Schedule 1 must allocate each planning, building, fire, environmental, utility and completion approval. The responsible party must obtain it before affected work begins. The Contractor must implement an appropriate quality and safety plan, keep inspection and labour records, protect adjoining property and coordinate subcontractors. Each party remains responsible for duties imposed on it by labour, construction-worker welfare, contract-labour, environmental and safety law. The Contractor must hold required registrations and ensure its personnel and subcontractors are legally engaged. No certification relieves it of compliance. 3. Contract Price and certification The Contractor may submit invoices at the valuation dates in Schedule 2 showing work completed, materials properly stored, approved Variations, GST, deductions and evidence. Within [seven] Business Days, the Contract Administrator must certify the amount reasonably due with reasons for any reduction. The Principal must pay the certified undisputed amount within [number] Business Days after certification. GST, tax deduction at source, construction-worker welfare cess and other statutory amounts must be handled as law requires and allocated in Schedule 2. Eligible enterprise rights under the Micro, Small and Medium Enterprises Development Act 2006 remain available. 4. Retention and security Any retention, performance security or advance-payment security must be stated in Schedule 2, including amount, form, expiry and release events. The Principal may call security only for an amount reasonably due after notice of the default, except where immediate call is lawfully necessary to preserve the security before expiry. Retention must be released at completion and expiry of the Defects Period in the stated proportions, subject to reasonable amounts for outstanding defects. 5. Variations The Contract Administrator may request a Variation, but it is effective only when authorised representatives sign its scope, valuation, programme effect and revised Completion Date. If the Principal instructs work before price agreement, the Contractor must keep records and the price is determined using applicable Schedule 2 rates or, if none, reasonable verified cost plus [percentage]% overhead and profit. Urgent protective work may proceed with prompt notice. 6. Time, delay and extension The Contractor must maintain and update the programme. It must notify a delaying event within [three] Business Days after awareness and provide particulars within [seven] further Business Days. The Completion Date extends to the extent of an approved Variation, Principal default, late access or design information, an undisclosed physical condition not reasonably discoverable, or an unavoidable event beyond reasonable control. Concurrent Contractor-caused delay is excluded to that extent. Delay damages, if stated in Schedule 2, apply only to Contractor-caused delay after the Completion Date, at the stated daily amount and cap, to the extent enforceable and not penal. 7. Testing, completion and defects The Contractor must give reasonable notice of tests and provide results. When the Works satisfy the completion criteria and required approvals allocated to it, it must request certification. Within [five] Business Days, the Contract Administrator must certify completion or list material non-compliance. Minor defects not preventing safe commercial use do not bar completion. The Contractor must correct defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. The Principal may correct an urgent or unremedied defect after reasonable notice and recover reasonable cost. Certification does not waive latent defects, fraud or mandatory rights. 8. Risk, title and insurance The Contractor bears risk in the Works until completion except to the extent caused by the Principal. Title to materials passes on payment or incorporation, whichever occurs first, free of undisclosed charge. The Contractor must provide evidence of the insurance in Schedule 3 before mobilisation, including contract works, worker and third-party liability cover where required. Each party must preserve insurance rights after an event. 9. Suspension and termination A party may suspend affected performance after [seven] Business Days' notice of an uncured material breach; the Contractor may immediately stop unsafe work. A party may terminate if a material breach remains uncured [fifteen] Business Days after notice or the other enters insolvency, subject to mandatory law. After termination, the Contractor must secure and leave the Site, and hand over paid-for work, materials and records. The Principal must pay for conforming work, verified materials and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. 10. Liability, disputes and general Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No cap excludes fraud, death or personal injury caused by negligence, unpaid amounts or another non-excludable liability. Any cap is stated in Schedule 3. Senior representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction. The Contractor remains responsible for subcontractors and may not subcontract the whole Works. Amendments must be signed. Notices must be written and delivered by hand, tracked post or email, effective on proven receipt. Counterparts and valid electronic signatures may be used. Applicable State or Union Territory stamp-duty and execution requirements must be completed. SCHEDULE 1 — PROJECT REQUIREMENTS Site, Project, drawings, specifications and exclusions: [details]. Programme, sectional milestones and Completion Date: [details]. Principal inputs, interfaces and access dates: [details]. Approvals, inspections and responsible party: [details]. Quality plan, tests and completion criteria: [details]. SCHEDULE 2 — PRICE, VALUATION AND SECURITY Contract Price, GST, TDS and cess allocation: [details]. Valuation dates, milestones, rates and evidence: [details]. Retention and release: [details]. Performance or advance security, if any: [details]. Delay damages, if agreed: [details]. SCHEDULE 3 — ADMINISTRATION, INSURANCE AND LIABILITY Contract Administrator and authority: [details]. Policies, limits and period: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. SIGNATURES For the Principal: [authorised signatory, position, signature and date]. For the Contractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for India