Design and Build Contract
Contract Template for India

Indian integrated design-and-construction contract covering employer requirements, approvals, milestone payments, variations, testing, completion, defects and design rights.

Governing law: IndiaPublished templateUpdated 2026-10-09
DESIGN AND BUILD CONTRACT
# DESIGN AND BUILD CONTRACT *India* Date: [date]. Employer: [full legal name, constitution, registration number and address] (Employer). Design-Builder: [full legal name, constitution, registration number and address] (Design-Builder). The Project is the design and construction of [facility/building] at [address, State/Union Territory] (Site). The Works are the design, construction, testing and handover described in Schedule 1. Contract Price means INR [amount], adjusted only under this Contract. Completion Date means [date]. Completion has the meaning in clause 7. Variation means a change authorised under clause 5. Business Day means a day other than Saturday, Sunday or public holiday at the Site. ## 1. Contract documents and design responsibility The Design-Builder must complete the Works with reasonable skill and care so that they comply with this Contract, the Employer's requirements and performance criteria in Schedule 1, applicable law, approved plans and required consents. The Contract comprises this document, signed Variations, Schedule 1, Schedule 2 and the Design-Builder's accepted proposal listed in Schedule 1, in that order if they conflict. The Design-Builder is responsible for coordinating its designers, contractors and suppliers and for the adequacy of its design. It must promptly notify an error, ambiguity or unsafe requirement that a competent design-builder should identify. It may rely on Employer information expressly identified in Schedule 1 but remains responsible for verifying dimensions and Site conditions reasonably capable of verification. ## 2. Employer inputs and approvals The Employer must provide lawful access, title or authority to build, decisions and Employer-supplied information and items by the dates in Schedule 1. Schedule 1 must allocate responsibility for planning, building, environmental, fire, utility, inspection, completion and occupancy approvals. The responsible party must obtain each approval before the affected work begins. The Design-Builder must submit the designs and samples stated in Schedule 1. An Employer review does not transfer design responsibility or relieve the Design-Builder from compliance. Nothing transfers or limits a statutory duty imposed on either party. ## 3. Site management, labour and safety The Design-Builder controls its methods, workforce and Site safety. It must comply with applicable labour, construction-worker welfare, environmental and safety law; obtain required registrations and licences; maintain Site records; protect adjoining property; and ensure competent supervision. It remains responsible for subcontractors and must not subcontract the whole Works without consent. ## 4. Price and payment The Employer must pay the Contract Price at the milestones in Schedule 2. Each invoice must identify completed work, approved Variations, GST, tax deduction at source, other statutory deductions and supporting measurements or certificates. Within [seven] Business Days after receipt, the Employer must pay the undisputed amount or give written reasons for each disputed item. Only a reasonably disputed amount may be withheld. If the Design-Builder is an eligible micro or small enterprise, nothing in this Contract reduces its rights under the Micro, Small and Medium Enterprises Development Act 2006. Any retention or performance security must be stated in Schedule 2, including amount, form, release events and expiry. ## 5. Variations A Variation is effective only when authorised representatives sign a document stating the changed work, price or valuation method, programme effect and revised Completion Date. The Design-Builder need not perform a proposed Variation before agreement, except urgent work reasonably required to prevent imminent injury or material damage. It must notify urgent work promptly and keep records. ## 6. Programme and extension of time The Design-Builder must maintain the programme in Schedule 1 and notify a likely delay within [three] Business Days after awareness, with cause, expected effect and mitigation. The Completion Date extends only for an approved Variation, Employer default, late access or information, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control, to the extent it delays completion despite mitigation. Delay damages stated in Schedule 2 apply only to Design-Builder-caused delay after the Completion Date, at the stated daily amount and cap, to the extent enforceable as reasonable compensation and not a penalty. ## 7. Testing, completion and defects The Design-Builder must give reasonable notice of tests and provide results. Completion occurs when the Works satisfy the completion criteria and performance tests in Schedule 1, required approvals allocated to the Design-Builder have been obtained, and only minor items not preventing safe intended use remain. Within [five] Business Days after a completion request, the Employer must issue a completion certificate or a reasonable list of material non-compliance. At handover, the Design-Builder must deliver as-built drawings, warranties, test records, manuals and approval records required by Schedule 1. It must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Certification, occupation or final payment does not waive latent defects, fraud or mandatory rights. ## 8. Intellectual property, risk and insurance The Design-Builder retains intellectual property in its design documents but grants the Employer a perpetual, royalty-free, transferable licence to use and adapt them to construct, complete, operate, maintain, repair and alter the Project. The Design-Builder must have authority to grant that licence. The Employer grants a limited licence to use Employer materials only for the Works. Risk in the Works remains with the Design-Builder until completion except to the extent caused by the Employer. Title to materials passes on payment or incorporation, whichever occurs first, free of undisclosed security interests. Before starting, the Design-Builder must provide evidence of the professional indemnity, contract works, worker and third-party liability insurance stated in Schedule 3. ## 9. Suspension and termination A party may suspend affected performance after [seven] Business Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. A party may terminate for an uncured material breach remaining after [fifteen] Business Days' notice or the other party's insolvency, subject to mandatory law. On termination, the Design-Builder must secure the Site and hand over paid-for work, materials and records. The Employer must pay for conforming work completed and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Design-Builder default. ## 10. Liability, disputes and general Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any liability cap is stated in Schedule 3. Senior representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction. Changes other than Variations must be signed. Notices must be written and delivered by hand, tracked post or email to Schedule 3, effective on proven receipt. Counterparts and valid electronic signatures may be used. The parties must complete applicable State or Union Territory stamp-duty and execution requirements. ## SCHEDULE 1 — PROJECT, DESIGN AND PROGRAMME Site and Employer's authority to build: [details]. Employer requirements, performance criteria, exclusions and accepted proposal: [details]. Employer information and reliance items: [details]. Design submissions, review periods and key personnel: [details]. Programme, Completion Date and dependencies: [details]. Approvals, inspections and responsible party: [details]. Tests, completion criteria and handover documents: [details]. ## SCHEDULE 2 — PRICE, PAYMENTS AND SECURITY Contract Price, GST and TDS: [details]. Milestones, amounts and evidence: [details]. Retention and release: [details or none]. Performance or advance-payment security: [details or none]. Delay damages, if agreed: [details]. ## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Employer: [authorised signatory, position, signature and date]. For the Design-Builder: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for India