Engineering, Procurement and Construction Agreement (EPC Agreement)
Contract Template for India

Indian EPC agreement for engineering, procurement, construction and commissioning of an industrial or infrastructure facility with performance testing and security terms.

Governing law: IndiaPublished templateUpdated 2026-10-09
ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (EPC AGREEMENT)
# ENGINEERING PROCUREMENT AND CONSTRUCTION AGREEMENT *India* Date: [date]. Owner: [full legal name, constitution, registration number and address] (Owner). EPC Contractor: [full legal name, constitution, registration number and address] (Contractor). The Facility is [industrial/infrastructure facility] at [address, State/Union Territory] (Site). The EPC Works are the engineering, procurement, construction, commissioning and handover described in Schedule 1. Contract Price means INR [amount], adjusted only under this Agreement. Scheduled Completion Date means [date]. Taking Over has the meaning in clause 8. Variation means a change authorised under clause 6. Business Day means a day other than Saturday, Sunday or public holiday at the Site. ## 1. EPC obligation The Contractor must engineer, procure, construct, test, commission and hand over the Facility in accordance with the output specifications, capacity, efficiency and other performance guarantees in Schedule 1, applicable law, approved plans and lawful instructions. It must provide all labour, supervision, equipment, materials, temporary works and services allocated to it. The Contractor is responsible for integration of the EPC Works and coordination of designers, vendors and subcontractors. It must promptly notify an error, ambiguity or unsafe requirement that a competent EPC contractor should identify. It may rely on Owner information expressly listed as a reliance item in Schedule 1 but must verify Site data and dimensions reasonably capable of verification. ## 2. Engineering and documents The Contractor must prepare calculations, drawings, specifications, quality plans, vendor data and operating documents required by Schedule 1. The Owner may review only for conformity with stated requirements. Review, comment or absence of comment does not transfer the Contractor's responsibility or authorise a deviation. The Contractor must maintain a controlled document register and deliver final as-built documents, software configurations, test records, spares lists, manuals and training materials at handover. ## 3. Approvals, Site and compliance The Owner must provide lawful Site access, title or authority, Owner permits and inputs by the dates in Schedule 1. Schedule 1 must allocate planning, building, environmental, fire, utility, import, inspection, factory and operating approvals. The responsible party must obtain an approval before the affected activity. The Contractor controls its methods and workforce and must comply with applicable labour, contract-labour, construction-worker welfare, environmental and safety law; obtain required registrations and licences; protect the Site and neighbours; and keep required records. It remains responsible for subcontractors and vendors. No clause transfers a statutory duty from the person on whom law places it. ## 4. Contract Price and payment The Owner must pay the Contract Price at the milestones in Schedule 2. A milestone invoice must show the achieved milestone, approved Variations, GST, customs or other taxes allocated to the Contractor, tax deduction at source and required evidence. Within [seven] Business Days after receipt, the Owner must pay the undisputed amount or give written reasons for each disputed item. Any advance, retention, performance security, advance-payment security or warranty security must be stated in Schedule 2, including amount, form, issuing institution, reduction, release and expiry. If the Contractor is an eligible micro or small enterprise, nothing limits its statutory payment and interest rights. ## 5. Procurement, title and care The Contractor must procure compliant equipment and materials from qualified sources, conduct inspections stated in Schedule 1 and provide certificates and warranties. It must not substitute a material item without an approved Variation. Title passes to the Owner on payment or delivery to the Site, whichever occurs first, free of undisclosed security interests. Risk and care remain with the Contractor until Taking Over except to the extent loss is caused by the Owner. ## 6. Variations A Variation is valid only if a document signed by authorised representatives states the changed requirement, price or valuation basis, programme effect, performance-guarantee effect and revised Scheduled Completion Date. The Contractor need not perform a proposed Variation before agreement, except urgent protective work reasonably required to prevent imminent injury or material damage. It must notify the Owner promptly and keep contemporaneous records. ## 7. Programme and delay The Contractor must maintain a detailed programme showing engineering, long-lead procurement, construction, pre-commissioning, performance testing and handover. It must notify a likely delay within [three] Business Days after awareness and provide particulars and mitigation within [seven] further Business Days. The Scheduled Completion Date extends to the extent completion is delayed by an approved Variation, Owner default, late access or input, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control despite mitigation. Delay damages in Schedule 2 apply only to Contractor-caused delay after that date, at the stated daily amount and cap, to the extent enforceable as reasonable compensation and not a penalty. ## 8. Tests and Taking Over The Contractor must conduct factory, Site, commissioning and performance tests in Schedule 1 and give reasonable notice. Taking Over occurs when the Facility passes the required tests, is safe and ready for its intended operation, required Contractor approvals are obtained, training and essential manuals are delivered, and only minor items not preventing operation remain. Within [five] Business Days after a Taking Over request, the Owner must issue a Taking Over Certificate or a reasonable list of material failures. If a performance result falls below a guaranteed value but above the minimum acceptance level in Schedule 1, the Owner may accept it only with the agreed performance adjustment in Schedule 2. Results below the minimum level are not accepted unless the parties sign a Variation. The Contractor must correct defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Taking Over, use or final payment does not waive latent defects, fraud or mandatory rights. ## 9. Intellectual property, insurance and liability The Contractor retains intellectual property in its engineering documents but grants the Owner a perpetual, royalty-free, transferable licence to use and adapt them to complete, operate, maintain, repair and alter the Facility. The Contractor must have authority to grant that licence and must provide source or escrow materials only if Schedule 1 expressly requires them. Before mobilisation, the Contractor must provide evidence of the professional indemnity, marine/transit, erection or contract works, worker and third-party liability insurance in Schedule 3. Each party is liable for direct loss caused by breach, negligence or wilful misconduct. No cap excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any cap is stated in Schedule 3. ## 10. Suspension, termination and disputes A party may suspend affected performance after [seven] Business Days' notice of an uncured material breach; immediate suspension is permitted for imminent safety risk. A party may terminate for a material breach remaining uncured [fifteen] Business Days after notice or insolvency, subject to mandatory law. On termination, the Contractor must make the Site safe and hand over paid-for work, equipment and records; the Owner must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default. Senior representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction. The Contractor may subcontract portions but remains responsible and may not subcontract the whole EPC Works without consent. Amendments must be signed. Notices must be written and delivered by hand, tracked post or email to Schedule 3, effective on proven receipt. Counterparts and valid electronic signatures may be used. Applicable State or Union Territory stamp-duty and execution requirements must be completed. ## SCHEDULE 1 — FACILITY AND TECHNICAL REQUIREMENTS Site, Facility, battery limits, exclusions and reliance items: [details]. Output specifications and guaranteed performance: [details]. Minimum acceptance levels and test methods: [details]. Engineering documents, review periods and quality plan: [details]. Programme, long-lead items and Scheduled Completion Date: [details]. Approvals, inspections and responsible party: [details]. Commissioning, training, spares and handover documents: [details]. ## SCHEDULE 2 — PRICE, PAYMENTS AND SECURITIES Contract Price, GST, customs and TDS allocation: [details]. Milestones, amounts and evidence: [details]. Advances, retentions and securities: [details or none]. Delay damages and performance adjustments: [details]. ## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS Policies, limits and periods: [details]. Liability cap, if agreed: [details]. Authorised representatives and notices: [details]. ## SIGNATURES For the Owner: [authorised signatory, position, signature and date]. For the Contractor: [authorised signatory, position, signature and date].

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for India