Engineering, Procurement and Construction Agreement
Contract Template For West Virginia, US

West Virginia EPC agreement for a privately owned construction project, covering licensed design and contracting, procurement, schedule, changes, payment, lien and local-venue requirements.

Governing law: West Virginia, USPublished templateUpdated 2026-10-30
ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT
# ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT This Engineering, Procurement and Construction Agreement is made on [date] between [owner legal name], a [entity and state] with an address at [address] ("Owner"), and [contractor legal name], a [entity and state] with an address at [address] ("EPC Contractor"). EPC Contractor's West Virginia contractor license number is [license number]. ## 1. Project and Contract Documents Owner engages EPC Contractor to design, procure and construct the privately owned improvement described in Schedule A (the "Project") at [street address, county, West Virginia] (the "Site"). EPC Contractor accepts responsibility for the engineering, procurement, construction, testing, commissioning and closeout services in Schedule A (the "Work"). The contract documents are this Agreement, its schedules, the approved design criteria, issued drawings and specifications, and signed Change Orders. If they conflict, a signed Change Order controls, then this Agreement, Schedule A, the design criteria, and the drawings and specifications. EPC Contractor will promptly request clarification and may not rely on a known conflict to reduce required performance. ## 2. Licensing, Design and Permits EPC Contractor represents that it and the responsible officer hold every West Virginia contractor license required for the Work and will keep the license active. It will display the license or copy at the Site and include its license number where law requires. It will maintain the business registration certificate required at the Site. Engineering, architecture, surveying and other professional services will be performed and sealed only by persons authorized in West Virginia for that discipline. EPC Contractor remains responsible for coordinating those professionals and for compliance of the completed design with Schedule A, applicable codes, permits and professional standards of care. Owner will provide accurate Site surveys, title information and existing-condition records identified as Owner responsibilities. EPC Contractor will obtain and pay for permits assigned to it in Schedule C. Owner will obtain land-use, owner-only and operating approvals assigned to Owner. Each party will give timely information and signatures needed for the other's applications. Neither party must perform unlawful work while an approval is absent. ## 3. Price and Payment Owner will pay the lump-sum or guaranteed maximum price stated in Schedule B (the "Contract Price"), subject only to signed Change Orders and allowances reconciled there. The Contract Price includes labor, design, supervision, materials, equipment, freight, taxes allocated to EPC Contractor, overhead, profit and all other costs necessary for the Work except listed exclusions. By the [day] of each month, EPC Contractor will submit an itemized application showing the schedule of values, percentage completed, stored materials, approved changes, prior payments, retainage and amount due. It will include evidence reasonably requested that subcontractors and suppliers have been paid and conditional lien releases effective upon payment, without requiring an advance waiver prohibited by law. Owner will pay undisputed amounts within [30] Days after a complete application. "Day" means calendar day unless stated otherwise. Owner may withhold a reasonable disputed amount for defective work, unsupported billing, failure to pay lower tiers, an asserted lien, or likely delay, after written explanation. Retainage is [percentage] and will be released as Schedule B states and law permits. ## 4. Schedule and Completion EPC Contractor will begin after written notice to proceed and achieve substantial completion by [date] and final completion by [date], subject to excusable delay and Change Orders. "Substantial Completion" means the Work is sufficiently complete for Owner's lawful intended use, required occupancy approval has issued, and only minor punch-list items remain. "Final Completion" means punch-list work, testing, final permits, closeout documents, warranties and correction of known defects are complete. Within [10] Days after notice to proceed, EPC Contractor will provide a logic-based schedule showing design, approvals, procurement, long-lead items, construction, testing and critical path. It will update monthly and promptly give notice of a delay event, expected effect and mitigation. Time extensions require a signed Change Order, except emergency protection may proceed under Section 8. ## 5. Procurement and Subcontractors EPC Contractor will procure new materials and equipment meeting the contract documents, unless Schedule A authorizes otherwise. It will pass through assignable manufacturer warranties and maintain procurement records, inspection reports and certificates. Substitutions require Owner's written approval and must meet or exceed specified performance without increasing cost or delay unless a Change Order states otherwise. EPC Contractor may use qualified subcontractors but remains responsible for the Work. It will provide the subcontractor and supplier list, require them to comply with safety, insurance, licensing and flow-down obligations, and pay them from corresponding Owner payments. Owner's review of a subcontractor does not relieve EPC Contractor. ## 6. Site, Safety and Quality Owner will provide lawful access to the Site and disclose known hazardous materials and concealed conditions in its possession. EPC Contractor controls construction means, methods, sequencing and Site safety and will comply with occupational-safety, environmental and building requirements. It will protect persons, existing improvements and neighboring property and keep the Site reasonably clean. EPC Contractor will implement the inspection and testing plan in Schedule C. Owner may inspect without directing means or methods. EPC Contractor will correct nonconforming Work at its cost. If testing reveals conformity, Owner pays requested extra testing; if it reveals nonconformity, EPC Contractor pays. ## 7. Changes A "Change Order" is a written instrument signed by authorized representatives of both parties stating the change in Work and any adjustment to Contract Price or time. Owner may request a proposal, and EPC Contractor will provide itemized price and schedule effects within [seven] Days. EPC Contractor will not proceed with a change before signature, except emergency work necessary to prevent imminent injury or material property damage. If EPC Contractor encounters a concealed physical condition materially different from the contract documents or ordinarily encountered conditions, it will stop affected Work, protect the Site and notify Owner before disturbance. The parties will investigate and, if justified, sign a Change Order. No adjustment is due for a condition EPC Contractor knew or reasonably should have identified from the stated preconstruction investigation. ## 8. Risk, Insurance and Indemnity Until Substantial Completion, EPC Contractor bears risk of loss to the Work and materials under its control, except loss caused by Owner. It will maintain workers' compensation, employer's liability, commercial general liability, automobile, builder's risk and professional liability insurance in the amounts in Schedule C and provide certificates and required additional-insured endorsements. To the extent caused by EPC Contractor's negligence, breach or violation of law, EPC Contractor will indemnify Owner from third-party bodily injury, death and tangible-property damage claims, including claims caused by persons for whom EPC Contractor is responsible. Owner will indemnify EPC Contractor to the same extent for Owner's negligence or breach. Each obligation is reduced by the protected party's fault and does not waive workers' compensation immunity or another nonwaivable rule. ## 9. Warranty and Correction EPC Contractor warrants that Work will be new unless authorized otherwise, conform to the contract documents, and be free from material defects. It will correct a defect reported within [one] year after Substantial Completion, or longer manufacturer warranty period, at its cost, including resulting damage. This period does not shorten an otherwise applicable limitation period or cover ordinary wear, improper Owner operation or unauthorized modification. ## 10. Suspension and Termination Owner may suspend Work by written order and will issue a Change Order for unavoidable cost and time caused by a suspension not due to EPC Contractor. EPC Contractor may suspend after [seven] Days' notice if Owner fails to pay an undisputed amount when due. Either party may terminate for material breach not cured within [10] Days after notice, or immediately for abandonment, required-license lapse, insolvency to the extent law permits, or serious safety violation. Owner may terminate for convenience on [seven] Days' notice and will pay for conforming Work, committed noncancelable materials, reasonable demobilization and the agreed termination fee in Schedule B, but not profit on unperformed Work. At termination, EPC Contractor will secure the Site, deliver design and procurement records paid for, assign cancellable subcontracts as requested, and provide an accounting. Rights to payment, correction, indemnity, records and dispute resolution survive. ## 11. Liens, Records and Disputes Nothing in this Agreement is an advance waiver of a lien, bond or payment right that cannot lawfully be waived. EPC Contractor will provide timely statutory notices, maintain payment records and promptly address liens caused by its failure to pay undisputed lower-tier amounts. Owner may make joint checks or direct payments after notice and credit them against the Contract Price. The parties will first confer through executives within [10] Days after written dispute notice while continuing undisputed Work. West Virginia law governs. Any civil action or arbitration permitted by a later signed agreement must be commenced and heard in West Virginia, in the county where the Project is located or another jurisdiction proper under West Virginia law. Courts in [project county], West Virginia have jurisdiction. ## 12. General Terms Neither party may assign this Agreement without consent, except Owner may assign to a project lender or successor owner that assumes Owner's duties. Notices must be written and delivered personally, by tracked courier or by email with confirmation. This Agreement is the entire agreement; amendments and waivers must be signed. Invalid terms are severed to the minimum extent necessary. No waiver is continuing. Counterparts and electronic signatures are effective. OWNER By: ____________________ Name/title: [name/title] Date: [date] EPC CONTRACTOR By: ____________________ Name/title: [name/title] Date: [date] ## SCHEDULE A — PROJECT AND WORK Project, Site, performance criteria, design deliverables and exclusions: [details] ## SCHEDULE B — PRICE AND PAYMENT Contract Price, schedule of values, allowances, retainage and convenience-termination fee: [details] ## SCHEDULE C — APPROVALS, TESTING AND INSURANCE Permits, inspections, commissioning tests and coverage limits: [details]

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.