Design-Build Construction Agreement
Contract Template For Michigan, US

Michigan design-build agreement integrating licensed design and construction services, project criteria, price, changes, permits, professional standard of care, trust-fund payments, lien documents, safety, and closeout.

Governing law: Michigan, USPublished templateUpdated 2026-11-09
DESIGN-BUILD CONSTRUCTION AGREEMENT
DESIGN-BUILD CONSTRUCTION AGREEMENT Michigan, US Agreement date: [date] Owner: [legal name and entity type], of [address], email [email] (Owner). Design-Builder: [legal name and entity type], of [address], license details [details], email [email] (Design-Builder). Project: [name and Michigan address] (Project). 1. Contract documents and project criteria Design-Builder shall design and construct the Project described in Schedule 1. The contract documents are this agreement, the Owner's project criteria, accepted design submissions, Schedule 2 pricing, Schedule 3 schedule, and signed change orders. If they conflict, a signed change order controls, then this agreement, then the schedules, then accepted design submissions. A later document controls only as to the specific work it changes. Owner shall provide accurate surveys, title restrictions, environmental information, existing drawings, utility information, and other owner-furnished data listed in Schedule 1. Design-Builder may reasonably rely on it but shall report an apparent inconsistency. 2. Design services Design-Builder shall provide design through Michigan-licensed architects, professional engineers, and other design professionals where licensure is required. Each design professional retains responsible control and shall seal documents when law requires. Design-Builder shall cause design services to meet the professional skill and care ordinarily exercised by similarly situated Michigan professionals for comparable projects. No perfect or error-free design is promised. Design-Builder shall submit the concept, design-development, permit, and construction documents identified in Schedule 3 for Owner review. Owner review confirms general conformity with the criteria and does not transfer professional responsibility. A material Owner-requested change after acceptance requires a change order. 3. Construction services Design-Builder shall furnish and supervise labor, materials, equipment, temporary facilities, testing, and subcontractors necessary for the work. Construction shall conform to accepted design documents, applicable codes, permits, and manufacturer requirements. Design-Builder remains responsible for coordinating its subcontractors and design consultants. If the Project is residential work for which a residential builder or maintenance-and-alteration contractor license is required, Design-Builder shall maintain that license throughout performance. Specialized electrical, mechanical, plumbing, and other regulated work shall be performed by properly licensed persons. 4. Contract price and payment The Contract Price is [stipulated sum of USD amount / cost of the work plus fee, subject to a guaranteed maximum price of USD amount], calculated in Schedule 2. Owner shall pay approved progress applications monthly within [number] days after receipt. Each application must describe completed work, stored materials, approved changes, retainage, prior payments, and the amount due. Payments received for building construction shall be handled consistently with Michigan's Building Contract Fund Act. Design-Builder shall use project funds to pay persons entitled to them before diverting those funds for an unrelated purpose. Owner may require conditional and unconditional lien waivers in forms and at stages permitted by Michigan law, a sworn statement when applicable, and evidence of payment. Owner may withhold only a reasonably supported amount for defective work, unpaid claims, failure to provide required documents, or material schedule default, and shall pay the undisputed balance. 5. Schedule Design-Builder shall begin by [date], achieve substantial completion by [date], and final completion by [date], subject to Schedule 3 milestones and authorized extensions. Substantial completion means the Project can be used for its intended purpose except for minor incomplete or corrective items and required approvals identified in a punch list. A party seeking time shall give prompt written notice of cause, effect, and mitigation. Time is extended for a signed change, concealed condition, Owner delay, permit delay not caused by Design-Builder, labor or material disruption beyond reasonable control, dangerous weather, or other excusable event, but only for the proven critical-path effect. 6. Permits, site, and concealed conditions Design-Builder shall obtain the building permits and inspections assigned in Schedule 1; Owner shall obtain land-use, financing, easement, and owner-specific approvals assigned there. Permit fees are [included/excluded] as stated in Schedule 2. Owner shall provide lawful access and disclose known hazardous materials and site conditions. On encountering an unknown hazardous material, subsurface condition, utility, or physical condition materially different from the contract documents, Design-Builder shall stop affected work, protect the site, and notify Owner. The parties shall investigate and sign a change order for any equitable price or time adjustment before resuming, except for emergency protection. 7. Changes No material change is authorized without a written change order describing scope, price, and time. Design-Builder may perform emergency work necessary to protect life or property after reasonable notice and shall document the cost. Owner may direct a proposed change, but Design-Builder need not proceed until the adjustment is agreed unless the parties sign a written construction-change directive with an interim valuation method. 8. Safety, insurance, and indemnity Design-Builder controls construction means, methods, sequencing, and site safety and shall comply with applicable safety law. Owner controls its separate contractors and shall coordinate them without directing Design-Builder's means and methods. Each party shall maintain the insurance in Schedule 2; Design-Builder shall require appropriate coverage from key consultants and subcontractors. To the extent caused by its negligent act, omission, or breach, each party shall indemnify the other from third-party bodily-injury and property-damage claims. Design-Builder's obligation includes acts of its subcontractors and consultants to the extent legally attributable to Design-Builder. No indemnity applies to the indemnitee's sole negligence or liability that Michigan law forbids shifting. 9. Inspection, correction, and warranties Owner may inspect without assuming control of the work. Design-Builder shall correct work that does not conform to the contract documents. Design-Builder warrants that construction materials will be new unless otherwise specified, the construction will be of good quality, and the work will conform to the contract documents. The correction period is [one] year after substantial completion, without shortening a longer statutory right or an assigned manufacturer warranty. Professional design services remain governed by the standard of care, not a strict construction warranty. 10. Suspension and termination Owner may suspend work by written notice and shall make an equitable adjustment for resulting cost and time unless suspension responds to Design-Builder's breach. Either party may terminate for a material breach not cured within [seven] days after detailed notice, or sooner if an immediate safety or legal violation cannot reasonably await cure. Design-Builder may suspend for undisputed nonpayment after [seven] additional days' notice. Owner may terminate for convenience on [seven] days' notice and shall pay for conforming work performed, properly ordered noncancelable materials, reasonable demobilization, and the termination fee stated in Schedule 2, less prior payments. Design-Builder shall deliver paid-for design instruments for Owner's limited use on this Project, subject to payment and the license in section 11. 11. Design documents and closeout Design professionals retain copyrights in their instruments of service. Upon payment, Owner receives a nonexclusive license to use them solely to construct, occupy, maintain, and alter this Project. Reuse without the responsible design professional is at Owner's risk, except to the extent law provides otherwise. At final completion, Design-Builder shall deliver final inspections, occupancy documents assigned to it, warranties, operating manuals, record information required by Schedule 1, final waivers, and a final payment application. Final payment is due after those items and punch-list completion, subject to a reasonable disputed holdback. 12. Disputes and general terms Project representatives shall first meet in good faith within [five] business days after written dispute notice. If unresolved, the parties shall [mediate before litigation / use the selected process in Schedule 2]. Emergency equitable relief and preservation of lien rights are not delayed beyond a legal deadline. Michigan law governs. Venue lies in [county], Michigan, subject to nonwaivable law. Notices must be written and delivered personally, by tracked delivery, or by acknowledged email. This agreement is the entire agreement. A change or waiver must be signed. Neither party may assign material duties without consent, except Owner may assign to a project lender that assumes payment obligations. Invalid language is narrowed or severed. Counterparts and electronic signatures are permitted. SCHEDULE 1 — PROJECT CRITERIA, SCOPE, OWNER INFORMATION, AND PERMITS [details] SCHEDULE 2 — PRICE, ALLOWANCES, PAYMENT, INSURANCE, AND TERMINATION [details] SCHEDULE 3 — DESIGN SUBMISSIONS, CONSTRUCTION MILESTONES, AND COMPLETION [details] OWNER Signature: ____________________ Date: __________ Name and title: [name and title] DESIGN-BUILDER Signature: ____________________ Date: __________ Name and title: [name and title]

Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.

More templates for Michigan, US