TOLL MANUFACTURING AGREEMENT
New Zealand

Date: [date].
Principal: [legal name, New Zealand company or business number and address] (Principal).
Processor: [legal name, New Zealand company or business number and address] (Processor).

Materials means the raw materials, components and packaging supplied or funded by the Principal and identified in Schedule 1. Processing means the treatment or manufacturing steps and controls in Schedule 1. Finished Output means Materials after conforming Processing. Processing Order means a written order accepted under clause 2. Agreed Process Loss means the yield or normal-loss range in Schedule 1. Principal Property means the Materials, work in progress, Finished Output, tooling and records owned by the Principal. Working Day means a day other than Saturday, Sunday or a public holiday at the processing facility.

1. Toll service and ownership
The Principal appoints the Processor to perform Processing for the toll charge in Schedule 2. Except for Processor-supplied items expressly sold under Schedule 2, this is a service applied to the Principal's property. Title to Principal Property remains with the Principal throughout.

The Processor must exercise reasonable care and skill, use suitable facilities and trained personnel, and process only under an accepted Processing Order. It must not sell, pledge, substitute, commingle or dispose of Principal Property except as this agreement expressly permits.

2. Orders and receipt
A Processing Order must state the Finished Output, quantity of Materials, target yield, toll charge, completion date and delivery location. It becomes binding only when accepted in writing within [three] Working Days. A forecast is not binding unless Schedule 2 says otherwise.

The Principal must deliver Materials with the agreed inventory, safety data, certificates and handling instructions. The Processor must promptly inspect apparent condition and quantity, record receipt and notify a discrepancy before use. The Processor is not responsible for a latent inherent defect in Materials unless it caused or should reasonably have detected it under the agreed inspection.

3. Custody and reconciliation
The Processor must identify and segregate Principal Property by owner and Processing Order, keep it at the approved location, protect it against contamination, deterioration, theft and unauthorised access, and maintain stock and Lot records for [period].

It bears responsibility for physical loss or damage while Principal Property is in its custody to the extent caused by its breach, negligence or wilful act. It must promptly report a spill, seizure, contamination, loss or threatened third-party claim. It must not claim a lien or security interest over Principal Property except a right that cannot lawfully be excluded.

4. Processing, yield and waste
The Processor must follow the approved Processing parameters and may not change a site, critical step, input, subcontractor or test method without written approval. For each Processing Order it must reconcile Materials received, Finished Output, Agreed Process Loss, recoverable scrap and unexplained variance.

Agreed Process Loss within the stated range is borne by [party]. The Processor must replace or pay the agreed value of avoidable excess loss caused by its breach. Recoverable scrap and by-product belong to [Principal/Processor] as stated in Schedule 1. Hazardous or unusable waste may be disposed of only in compliance with law and the Principal's written instructions, with evidence supplied.

5. Quality, compliance and health and safety
The Processor must test Finished Output against Schedule 1, maintain a complete Lot record and release it only through an authorised quality representative. It must isolate nonconforming output and promptly disclose a deviation, failed test, safety issue or regulator contact.

The Principal is responsible for the design, formula, intended use and regulatory matters allocated to it. The Processor is responsible for its facility, Processing, workmanship, environmental controls and matters allocated to it. Any product-specific approval, consumer-information duty or standard must be identified in Schedule 1.

Each party remains responsible for its Health and Safety at Work Act 2015 duties and must consult, cooperate and coordinate where their work overlaps. Nothing transfers or excludes a statutory duty.

6. Collection, inspection and remedy
The Processor must package and make Finished Output available or deliver it as Schedule 2 states. Risk passes on completed delivery at the named place or collection by the Principal's carrier, while title remains with the Principal.

The Principal may inspect within [ten] Working Days and reject Finished Output that fails the Processing specification by giving details. Latent failures may be notified when reasonably found. For a failure caused by its breach, the Processor must, at the Principal's reasonable election, reprocess, replace lost Materials or refund the affected toll charge and bear reasonable direct transport and retest cost. The Principal bears remedial cost caused by defective Materials or inaccurate instructions it supplied.

7. Charges, GST and statutory rights
The toll charge, any Processor-supplied items, price adjustment, GST and invoicing are in Schedule 2. The Processor must provide taxable supply information where required. The Principal must pay undisputed invoices within [twenty] Working Days and promptly explain any dispute.

If both parties are in trade, the service is acquired in trade and Schedule 2 expressly records agreement to contract out of identified provisions of the Consumer Guarantees Act 1993 or Fair Trading Act 1986, that agreement applies only to the extent permitted and fair and reasonable. Otherwise all non-excludable rights remain.

8. Information and improvements
The Principal licenses its Processing specification and technical information to the Processor during the term solely for accepted Processing Orders. No ownership transfers. Improvements specifically commissioned and identified in Schedule 3 are assigned to the Principal on full payment. The Processor retains its pre-existing and generally applicable plant methods and know-how.

Each party must protect the other's non-public technical and commercial information and disclose it only to bound personnel, approved subcontractors and advisers who need it, or as law requires.

9. Term and cancellation
This agreement starts on [date] and continues for [term]. Either party may end it on [sixty] days' notice without cancelling an accepted Processing Order unless agreed. A party may cancel for material breach when contractual and statutory requirements are met, including after [ten] Working Days to remedy where cure is possible. Immediate cancellation is permitted for fraud, insolvency, unlawful processing or an unremedied serious safety risk.

On ending, the Processor must stop Processing, safely complete or suspend work as instructed, provide a final reconciliation, return Principal Property and records, and dispose of waste only as authorised. The Principal must pay for conforming completed services. Ownership, accrued payment, confidentiality, record access and remedies survive.

10. General
The Processor may not subcontract a material operation without written consent and remains responsible for approved subcontractors. Changes must be signed by authorised representatives. Notices must be delivered by hand, tracked post or email and are effective on proven receipt. Neither party may assign this agreement without consent except to a successor to substantially all the relevant business that assumes it.

New Zealand law governs, and New Zealand courts have jurisdiction.

SCHEDULE 1 MATERIALS, PROCESSING AND OUTPUT
[Materials/owner; Processing; facility; target yield and Agreed Process Loss; Finished Output; tests; scrap/by-product; waste; approvals and responsible party].

SCHEDULE 2 ORDERS, LOGISTICS AND CHARGES
[Order method; toll charge; Processor items; GST; lead time; delivery/collection; insurance; invoicing/payment; any specific and fair trade-only contracting out].

SCHEDULE 3 TOOLING AND INTELLECTUAL PROPERTY
[Tooling; confidential information; commissioned improvements; background methods; return/PPSR arrangements].

SIGNATURES
For the Principal: [authorised signatory, position, signature and date].
For the Processor: [authorised signatory, position, signature and date].
Witness if used: [name, address, signature and date].



---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.
License details: https://contract-templates.getfebruary.ai/license/