MAINTENANCE AGREEMENT
New Zealand

Date: [date].
Asset Owner: [legal name, New Zealand company or business number and address] (Owner).
Maintenance Contractor: [legal name, New Zealand company or business number and address] (Contractor).

Asset means an item in Schedule 1. Planned Work means the inspection, testing, adjustment and servicing stated there. Fault means an Asset's failure to meet its listed operating condition. Working Day means a day other than Saturday, Sunday or a public holiday at the service location.

1. Engagement
The Owner engages the Contractor to carry out Planned Work and agreed Fault work for the Assets at the Sites. The Contractor must exercise reasonable care and skill, use competent personnel, comply with applicable licences and follow current manufacturer instructions where reasonably available.

Schedule 1 must identify the Assets, identifiers, locations, apparent starting condition, included work and exclusions. Schedule 2 must state service times, planned attendance, Fault priorities, response measures and prices. No unlisted asset or out-of-scope work is included without a written quote or change accepted by the Owner.

2. Initial condition and planned attendance
The parties must record existing defects and condition before substantive work. The Contractor is not responsible for an undisclosed pre-existing defect but must report a material defect it finds and recommend safe next steps.

The Contractor must give reasonable notice of planned attendance, complete the stated checklist, use suitable equipment and leave the work area safe and reasonably clean. It must give a service record stating the work, readings, parts, unresolved defects and recommendations. An Owner acknowledgement confirms receipt only and does not waive a latent or notified failure.

3. Fault response
The Owner must report a Fault through the agreed contact and provide available symptoms, priority information and access. The response measure is [acknowledgement/remote attendance/site arrival] as Schedule 2 states and is not a guaranteed repair time.

The Contractor must diagnose the Fault, complete work within scope and obtain approval before extra-charge work. It may take immediate protective action up to NZD [limit] without prior approval only where reasonably needed to prevent serious injury or material property damage and the Owner cannot be reached. It must explain and record the action.

4. Parts and workmanship
The Contractor must obtain approval before supplying a chargeable part outside the emergency limit. Parts must meet the agreed specification. A compatible, used or reconditioned part requires express approval. Title passes on payment; risk passes when installed or delivered. Removed parts belong to [Owner/Contractor] except manufacturer warranty returns, and regulated waste must be handled lawfully.

The Contractor warrants its repair workmanship for [ninety] days. A part carries any transferable manufacturer warranty. On prompt notice of attributable defective workmanship, the Contractor must reperform it without labour charge. This clause does not limit any right that cannot lawfully be excluded.

5. Owner cooperation and site safety
The Owner must provide safe access, shutdown authority, utilities, manuals and known-hazard information, and operate Assets in accordance with reasonable instructions. Data backup and operational continuity remain the Owner's responsibility unless Schedule 1 says otherwise.

The Contractor may stop affected work if it reasonably believes there is an immediate risk, unlawful instruction or unsuitable condition. It must promptly notify the Owner and resume after the issue is controlled.

Each party retains its duties under the Health and Safety at Work Act 2015. Where duties overlap, they must consult, cooperate and coordinate so far as required, and each must manage risks within its influence and control. This agreement does not transfer a statutory duty.

6. Contractor status and subcontracting
The Contractor controls and pays its personnel and is responsible for employment, tax and other obligations. Nothing creates employment, partnership, agency or authority to bind the Owner. The practical work arrangement must remain consistent with independent-contractor status.

The Contractor may subcontract specialised work only with prior written consent and remains responsible for it. A subcontractor must comply with equivalent safety, confidentiality and site-access requirements.

7. Price, GST and records
The Owner must pay an undisputed invoice within [twenty] Working Days. Prices are [inclusive/exclusive] of GST, and the Contractor must supply taxable supply information when required. Pre-approved travel, parts and other expenses must be itemised and evidenced. The Owner may withhold a genuinely disputed amount after prompt reasons and must pay the balance.

The Contractor must retain maintenance and parts records for [three] years and give the Owner a service history for its Assets. Records must be accurate enough to support work and invoices.

8. Confidentiality and system access
Each party must protect the other's confidential information with reasonable care and use it only for this agreement. Disclosure is permitted to bound personnel and advisers who need it, or as law requires. Information lawfully known, independently developed or public without breach is excluded. The duty continues for [three] years.

Before the Contractor accesses an information system or personal information, the parties must record the authorised purpose, access, safeguards, retention and return in Schedule 1. Each must comply with the Privacy Act 2020 for its role. The Contractor must restrict access and promptly report unauthorised access, loss or disclosure.

9. Business protections, liability and insurance
The services are acquired in trade. To the maximum extent permitted by section 43 of the Consumer Guarantees Act 1993, the parties agree that Act does not apply and it is fair and reasonable to contract out. To the maximum extent permitted by section 5D of the Fair Trading Act 1986, they contract out of sections 9, 12A and 13 for this agreement because both are in trade and it is fair and reasonable. Nothing excludes a non-excludable protection.

Each party is responsible for direct loss caused by its breach or negligence. Neither is liable for indirect or consequential loss or lost profit where exclusion is lawful. The Contractor's aggregate liability is capped at [amount or charges paid/payable in the previous twelve months]. The cap and exclusion do not apply to fraud, wilful misconduct, confidentiality or privacy misuse, death or personal injury, or liability that cannot lawfully be limited.

The Contractor must maintain public liability insurance of at least NZD [amount], workers' cover required by law and any insurance stated in Schedule 2.

10. Term and cancellation
This agreement runs from [date] until [date/completion]. A party may cancel for repudiation or a breach meeting the Contract and Commercial Law Act 2017 requirements. A remediable material breach must first receive [ten] Working Days to be remedied. Fraud, insolvency or unlawful performance permits immediate cancellation.

The Owner may cancel for convenience on [thirty] days' notice and must pay for conforming work, approved parts already ordered and disclosed reasonable non-cancellable commitments. On ending, the Contractor must make the Site safe, return keys and property, remove its equipment and give current service records. Accrued payment, warranties, confidentiality, liability and disputes survive.

11. General
A party is not liable for affected delay from an event beyond reasonable control if it promptly notifies, mitigates and resumes. Changes and waivers must be recorded in writing. Notices are effective on proven receipt by hand, tracked post or email. Neither party may transfer this agreement without consent, except to a successor to substantially all the relevant business that assumes it.

If a provision is unenforceable, it is limited or severed without affecting the rest. Counterparts and reliable electronic signatures agreed by the parties may be used. New Zealand law governs, and New Zealand courts have jurisdiction.

SCHEDULE 1 — ASSETS AND WORK
Sites, Assets, identifiers, operating condition and criticality: [details].
Planned Work, checks, tests, exclusions and Owner dependencies: [details].
Access, shutdown, data, security and site-safety requirements: [details].

SCHEDULE 2 — SERVICE AND PRICE
Planned attendance, service hours and Fault contact: [details].
Priorities, response measures and escalation: [details].
Included labour, travel, consumables and parts: [details].
Prices, GST, emergency limit and insurance: [details].

SIGNATURES
For the Owner: [authorised signatory, position, signature and date].
For the Contractor: [authorised signatory, position, signature and date].
Witness if used: [name, address, signature and date].



---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.
License details: https://contract-templates.getfebruary.ai/license/