COMMERCIAL CONSTRUCTION CONTRACT
New Zealand

Date: [date].
Principal: [full legal name, constitution, NZBN/company number and address] (Principal).
Contractor: [full legal name, constitution, NZBN/company number and address] (Contractor).

Project means the commercial premises described in Schedule 1 at [site address] (Site). Works means constructing the Project to the Principal's listed design and specifications. Contract Price means NZD [amount] plus GST, adjusted only under this Contract. Completion Date means [date]. This Contract excludes residential building work for a household unit.

1. Project delivery
The Contractor must mobilise, execute, test and complete the Works with reasonable skill and care in accordance with Schedule 1, consented documents, applicable law and lawful instructions of the Contract Administrator identified in Schedule 3. It must provide the labour, materials, plant, temporary works, supervision and coordination allocated to it. It is responsible for construction methods and temporary works, but not the adequacy of a Principal-supplied design except for an apparent error it fails to report.

The Principal must provide lawful Site access, design information, decisions, interfaces and Principal-supplied items by the dates in Schedule 1. The Contract Administrator may value and certify but may not amend this Contract unless expressly authorised.

2. Consents, safety and quality
Schedule 1 must allocate each building consent, resource consent, fire or utility approval, inspection and code compliance certificate. The responsible party must obtain it before affected work begins. The Contractor must maintain an appropriate quality plan, give notice of inspections, keep test records and protect the Site and adjoining property.

Each party must comply with duties applying to it under the Health and Safety at Work Act 2015 and consult, cooperate and coordinate with other duty holders. No clause transfers or limits a statutory duty. The Contractor must make required WorkSafe notifications and ensure competent supervision.

3. Payment claims and certification
At the valuation dates in Schedule 2, the Contractor may serve a payment claim complying with section 20 of the Construction Contracts Act 2002. Each claim must identify the period and Works, calculate the amount including approved Variations, state the due date and include the prescribed explanation.

Within [10] working days after service, the Principal must pay the claimed amount or serve a payment schedule complying with section 21 that states the scheduled amount and reasons for each difference. The Contract Administrator's assessment supports the schedule but does not displace statutory responsibility. Payment is due [20] working days after service unless Schedule 2 lawfully states another date.

4. Retention money and security
Any retention, performance bond or advance-payment security must be stated in Schedule 2. To the extent subpart 2A of the Construction Contracts Act 2002 applies, retention money is trust money and the retaining party must keep, use, account for, report on and pay it as required. A bond may be called only in accordance with its terms and for an amount reasonably connected to the secured default, subject to law.

5. Variations
The Contract Administrator may request a Variation, but it is effective only when a written instruction or agreement identifies the changed work, valuation method, programme effect and revised Completion Date. If instructed work proceeds before valuation is agreed, the price is determined using applicable Schedule 2 rates or reasonable verified cost plus [percentage]% overhead and profit. Urgent protective work may proceed with prompt notice and records.

6. Programme, delay and extensions
The Contractor must maintain and update the programme. It must notify a delaying event within [three] working days after awareness and provide particulars within [seven] further working days. The Completion Date extends to the extent of an approved Variation, Principal default, late access or design information, an undisclosed physical condition not reasonably discoverable, or an unavoidable event beyond reasonable control. Concurrent Contractor-caused delay is excluded to that extent.

Delay damages, if stated in Schedule 2, apply only to Contractor-caused delay after the Completion Date at the stated daily amount and cap, subject to the law on penalties.

7. Testing, completion and defects
The Contractor must give reasonable notice of tests and provide results. When the Works satisfy the completion criteria and required approvals allocated to it, the Contractor must request certification. Within [five] working days, the Contract Administrator must certify completion or list material non-compliance. Minor defects not preventing safe commercial use do not bar completion.

The Contractor must correct defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. After reasonable notice, the Principal may correct an urgent or unremedied defect and recover reasonable cost. Certification does not waive latent defects, fraud or mandatory rights.

8. Risk, title and insurance
The Contractor bears risk in the Works until completion except to the extent caused by the Principal. Title to materials passes on payment or incorporation, whichever occurs first, free of undisclosed security interest. Before mobilisation, the Contractor must provide evidence of contract works, public liability and other insurance stated in Schedule 3. The parties must preserve insurance rights after an event.

9. Suspension and termination
A party may suspend affected performance after [seven] working days' notice of an uncured material breach; statutory suspension rights remain available and unsafe work may stop immediately. A party may terminate if a material breach remains uncured [fifteen] working days after notice or the other enters insolvency, subject to mandatory law.

After termination, the Contractor must secure and leave the Site and hand over paid-for work, materials and records. The Principal must pay for conforming work, verified materials and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Contractor default.

10. Liability, disputes and general
Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No cap excludes fraud, death or personal injury caused by negligence, unpaid amounts or another non-excludable liability. Any cap is stated in Schedule 3.

Senior representatives must meet within [five] working days after a dispute notice. Either party may refer a dispute to adjudication under the Construction Contracts Act 2002 at any time. Other statutory enforcement and court rights remain available. New Zealand law governs and its courts have jurisdiction.

The Contractor remains responsible for subcontractors and may not subcontract the whole Works without consent. Amendments must be signed. Notices must be written and served consistently with statutory requirements. Counterparts and electronic signatures may be used where the Contract and Commercial Law Act 2017 permits.

SCHEDULE 1 — PROJECT REQUIREMENTS
Site, Project, drawings, specifications and exclusions: [details].
Programme, sectional milestones and Completion Date: [details].
Principal inputs, interfaces and access dates: [details].
Consents, inspections and responsible party: [details].
Quality plan, tests and completion criteria: [details].

SCHEDULE 2 — PRICE, CLAIMS AND SECURITY
Contract Price and GST: [details].
Valuation dates, milestones, rates and evidence: [details].
Payment-schedule period and due date: [details].
Retention and release: [details or none].
Performance or advance security, if any: [details].
Delay damages, if agreed: [details].

SCHEDULE 3 — ADMINISTRATION, INSURANCE AND LIABILITY
Contract Administrator and authority: [details].
Policies, limits and period: [details].
Liability cap, if agreed: [details].
Authorised representatives and notices: [details].

SIGNATURES
For the Principal: [authorised signatory, position, signature and date].
For the Contractor: [authorised signatory, position, signature and date].


---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.