BUILDING CONTRACT
New Zealand

Date: [date].
Owner: [full legal name, constitution, NZBN/company number and address] (Owner).
Builder: [full legal name, constitution, NZBN/company number and address] (Builder).

Building means the non-residential building described in Schedule 1 at [site address] (Site). Works means constructing and handing over the Building to the Owner's listed design. Contract Price means NZD [amount] plus GST, adjusted only under this Contract. Completion Date means [date]. This Contract is not for residential building work in relation to a household unit.

1. Contract work
The Builder must construct and complete the Building with reasonable skill and care in accordance with Schedule 1, the consented documents, applicable law and lawful instructions. The Builder must provide the labour, materials, plant, supervision and temporary works allocated to it in Schedule 1. It is responsible for construction methods but not the adequacy of an Owner-supplied design, except that it must promptly warn of an apparent error a competent builder should identify.

The Owner must provide lawful access, design information, decisions and Owner-supplied items by the dates in Schedule 1. If contract documents conflict, this Contract prevails, followed by signed Variations, specifications and drawings.

2. Consents, safety and insurance
Schedule 1 must allocate responsibility for building and resource consents, inspections, utility approvals and the code compliance certificate. The responsible party must obtain each approval before the affected work begins. The Builder must perform consented work in accordance with the consent and must notify the Owner of required inspection points.

Each party must comply with duties applying to it under the Health and Safety at Work Act 2015 and must consult, cooperate and coordinate with other duty holders. No clause transfers or limits a statutory duty. Before starting, the Builder must provide evidence of the contract works, public liability and other insurance stated in Schedule 3.

3. Payment claims
The Builder may serve payment claims at the milestones in Schedule 2. Each claim must comply with section 20 of the Construction Contracts Act 2002, identify the relevant period and work, show the claimed amount and calculation, state the due date and include the prescribed explanation.

Within [10] working days after service, the Owner must pay the claimed amount or serve a payment schedule complying with section 21 that states the scheduled amount and explains every difference. Payment is due [20] working days after the claim unless Schedule 2 lawfully states another date. The statutory consequences of failing to schedule or pay, suspension rights and adjudication rights apply.

4. Retentions
Any retention must be stated in Schedule 2. Where subpart 2A of the Construction Contracts Act 2002 applies, retention money is held on trust and must be kept, accounted for, reported on, used and paid only as that Act permits. Schedule 2 must state release events; no release condition overrides mandatory law.

5. Variations
A Variation must be in writing and state the changed work, valuation method, programme effect and revised Completion Date. The Builder need not perform a proposed Variation until those matters are agreed, except urgent work reasonably required to prevent imminent injury or material damage. For urgent work, it must notify the Owner promptly and keep records.

6. Time and delay
The Builder must follow the programme and notify a likely delay within [three] working days after awareness, stating cause, effect and mitigation. The Completion Date extends to the extent delay is caused by an approved Variation, Owner default, late access or information, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control. The Builder must mitigate.

If stated in Schedule 2, delay damages apply only to Builder-caused delay after the Completion Date at NZD [amount] per working day, capped at [percentage]% of the Contract Price, subject to the law on penalties.

7. Completion and defects
The Builder must notify when the Building satisfies the completion criteria and is ready for inspection. Within [five] working days, the Owner must issue a completion certificate or a reasonable list of incomplete or defective work. Minor defects that do not prevent safe intended use do not justify refusal.

The Builder must correct defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. The Owner must allow access. Completion and final payment do not waive fraud, latent defects or rights that cannot lawfully be excluded.

8. Title, risk and Site care
Title to materials passes on the earlier of payment or incorporation into the Building, free of undisclosed security interest. The Builder bears risk in the Works until completion except to the extent caused by the Owner. It must protect the Site and adjoining property, minimise nuisance and remove waste.

9. Suspension and termination
A party may suspend affected performance after [seven] working days' notice of an uncured material breach, except immediate suspension is permitted for imminent safety risk. Statutory suspension rights remain available. A party may terminate if a material breach remains uncured [fifteen] working days after notice or the other enters insolvency, subject to mandatory law.

On termination, the Builder must secure the Site and hand over paid-for work, materials and records. The Owner must pay for conforming work and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Builder default.

10. Liability, disputes and general
Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, or another liability that cannot lawfully be limited. Any cap is stated in Schedule 3.

Senior representatives must meet within [five] working days after a dispute notice. Either party may refer a dispute to adjudication under the Construction Contracts Act 2002 at any time. New Zealand law governs and its courts have jurisdiction.

The Builder remains responsible for subcontractors and may not subcontract the whole Works without consent. Amendments must be signed. Notices must be written and served consistently with applicable statutory rules. Counterparts and electronic signatures may be used where the Contract and Commercial Law Act 2017 permits.

SCHEDULE 1 — BUILDING, SITE AND PROGRAMME
Site, Building, drawings, specifications and exclusions: [details].
Programme, Completion Date and dependencies: [details].
Owner inputs and access dates: [details].
Consents, inspections and responsible party: [details].
Testing and completion criteria: [details].

SCHEDULE 2 — PRICE, CLAIMS AND RETENTIONS
Contract Price and GST: [details].
Claim milestones, calculations and evidence: [details].
Payment-schedule period and due date: [details].
Retention and release: [details or none].
Delay damages, if agreed: [details].

SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS
Policies, limits and period: [details].
Liability cap, if agreed: [details].
Authorised representatives and notices: [details].

SIGNATURES
For the Owner: [authorised signatory, position, signature and date].
For the Builder: [authorised signatory, position, signature and date].



---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.