# SUBCONTRACT

*India*

Date: [date].

Main Contractor: [full legal name, constitution, registration number and address] (Main Contractor).

Subcontractor: [full legal name, constitution, registration number and address] (Subcontractor).

The Project is [project] for [employer] at [address, State/Union Territory] (Site). The Subcontract Works are the work described in Schedule 1. Subcontract Price means INR [amount] or the rates and measurements in Schedule 2. Completion Date means [date]. Completion has the meaning in clause 7. Main Contract means only the identified documents and obligations listed in Schedule 1. Variation means a change authorised under clause 5. Business Day means a day other than Saturday, Sunday or public holiday at the Site.

## 1. Subcontract Works

The Subcontractor must execute, complete and correct the Subcontract Works with reasonable skill and care, using suitable labour, materials, equipment and supervision, in accordance with this Subcontract, the specifications in Schedule 1, applicable law and lawful Site directions. It must verify dimensions reasonably capable of verification and promptly notify an inconsistency, unsafe instruction or apparent error before acting.

Only the Main Contract provisions reproduced or precisely identified in Schedule 1 bind the Subcontractor, and only to the extent relevant to the Subcontract Works and not inconsistent with this Subcontract. The Subcontractor is not taken to know undisclosed Main Contract terms. No term creates a contract between the Subcontractor and the employer.

## 2. Main Contractor obligations and coordination

The Main Contractor must provide lawful Site access, approved information, setting-out data, interfaces with other contractors, available programme information and Main Contractor-supplied items by the dates in Schedule 1. It must coordinate the Subcontract Works with the Project and give the Subcontractor reasonable opportunity to perform.

The Main Contractor may issue Site directions within the existing scope. A direction changing scope, quality, sequence, quantity or timing is a proposed Variation and must follow clause 5.

## 3. Compliance, personnel and safety

The Subcontractor controls its work methods and personnel and must comply with applicable labour, contract-labour, construction-worker welfare, safety and environmental law; maintain required registrations, licences and records; follow the lawful Site safety plan; protect completed work; and remove waste. It must immediately report incidents and unsafe conditions.

Each party remains responsible for statutory duties imposed on it, including principal-employer duties. The Subcontractor may use lower-tier subcontractors only with consent, remains responsible for them and may not subcontract the whole Subcontract Works.

## 4. Measurement, invoices and payment

For lump-sum work, payment follows the milestones in Schedule 2. For remeasurable work, the parties must jointly measure completed quantities and apply the stated rates; if the Main Contractor does not attend after reasonable notice, the Subcontractor may record measurements with supporting evidence, subject to later verification.

Each invoice must show completed Subcontract Works, measurements, approved Variations, GST, tax deduction at source and supporting records. Within [seven] Business Days after receipt, the Main Contractor must pay the undisputed amount or give written reasons for each disputed item. Payment is not conditional on the Main Contractor receiving payment from the employer. Only a reasonably disputed amount may be withheld.

If the Subcontractor is an eligible micro or small enterprise, no payment term or certification process limits its rights under the Micro, Small and Medium Enterprises Development Act 2006. Retention, if any, must be stated in Schedule 2 and released at the stated events.

## 5. Variations

A Variation is valid only when a signed instruction or agreement states the changed work, valuation basis, programme effect and revised Completion Date. Before performing it, the parties must agree a lump sum or use the Schedule 2 rates or, if none applies, reasonable verified cost plus [percentage]% overhead and profit. Urgent work reasonably required to prevent imminent injury or material damage may proceed with prompt notice and records.

## 6. Time and extension

The Subcontractor must start on [date], follow the Schedule 1 programme and notify a likely delay within [three] Business Days after awareness, stating cause, effect and mitigation. The Completion Date extends to the extent delay results from an approved Variation, Main Contractor default, late access or information, interference by others, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond reasonable control despite mitigation.

Delay damages stated in Schedule 2 apply only to Subcontractor-caused delay after the Completion Date, at the stated daily amount and cap, to the extent enforceable as reasonable compensation and not a penalty.

## 7. Inspection, completion and defects

The Main Contractor may inspect without unreasonably disrupting work. The Subcontractor must correct non-conforming work for which it is responsible. Within [five] Business Days after a completion request, the Main Contractor must issue a completion certificate or a reasonable list of material defects or incomplete items. Minor items not preventing the intended use of the Subcontract Works do not justify refusal.

The Subcontractor must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period. Completion, incorporation into the Project or payment does not waive latent defects, fraud or mandatory rights.

## 8. Materials, risk and insurance

The Subcontractor bears risk in the Subcontract Works until completion except to the extent loss is caused by the Main Contractor or others under its control. Title to materials passes on payment or incorporation into the Project, whichever occurs first, free of undisclosed security interests. The Subcontractor must provide evidence of the worker, third-party liability and work insurance stated in Schedule 3. Insurance does not limit responsibility.

## 9. Suspension and termination

The Subcontractor may suspend affected work after [seven] Business Days' notice of an unpaid undisputed amount or other uncured material breach. Either party may suspend immediately for imminent safety risk. A party may terminate for a material breach remaining uncured [fifteen] Business Days after notice or insolvency, subject to mandatory law.

On termination, the Subcontractor must make its area safe and hand over paid-for work, materials and records. The Main Contractor must pay for conforming work, verified materials and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Subcontractor default.

## 10. Liability, disputes and general

Each party is liable for direct loss caused by breach, negligence or wilful misconduct. No limitation excludes fraud, death or personal injury caused by negligence, unpaid amounts or liability that cannot lawfully be limited. Any cap is stated in Schedule 3.

Representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction.

Amendments must be signed. Notices must be written and delivered by hand, tracked post or email to Schedule 3, effective on proven receipt. Counterparts and valid electronic signatures may be used. Applicable State or Union Territory stamp-duty and execution requirements must be completed.

## SCHEDULE 1 — PROJECT, SUBCONTRACT WORKS AND PROGRAMME

Site, Project and employer: [details].

Subcontract Works, drawings, specifications and exclusions: [details].

Identified Main Contract documents and relevant obligations: [details].

Main Contractor inputs, interfaces and supplied items: [details].

Programme, Completion Date and completion criteria: [details].

Permits, inspections and responsible party: [details].

## SCHEDULE 2 — PRICE, MEASUREMENT AND PAYMENT

Lump sum or rates and quantities: [details].

Milestones, claim dates and evidence: [details].

Variation rates and overhead/profit percentage: [details].

Retention and release: [details or none].

Delay damages, if agreed: [details].

## SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS

Policies, limits and periods: [details].

Liability cap, if agreed: [details].

Authorised representatives and notices: [details].

## SIGNATURES

For the Main Contractor: [authorised signatory, position, signature and date].

For the Subcontractor: [authorised signatory, position, signature and date].


---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.