BUILDING CONTRACT
India

Date: [date].
Owner: [full legal name, constitution, registration number and address] (Owner).
Builder: [full legal name, constitution, registration number and address] (Builder).

Building means the non-residential building described in Schedule 1 on the Owner-controlled land at [address and title/plot details] (Site). Works means constructing and handing over the Building in accordance with Schedule 1. Contract Price means INR [amount], adjusted only under this Contract. Completion Date means [date].

1. Contract documents and work
The Builder must execute and complete the Works with reasonable skill and care in accordance with this Contract, the drawings and specifications listed in Schedule 1, approved plans, applicable law and lawful instructions. If documents conflict, this Contract prevails, followed by signed Variations, specifications and drawings in that order. The Builder must provide all labour, supervision, materials, plant and temporary works allocated to it in Schedule 1.

The Owner must give lawful access, possession sufficient to perform the Works, and the information and Owner-supplied items stated in Schedule 1 by the stated dates. The Builder may rely on an Owner-supplied design but must promptly notify an apparent error that a competent builder should identify.

2. Approvals and statutory duties
Schedule 1 must allocate responsibility for each building permission, planning approval, fire approval, utility approval, environmental consent, inspection and completion or occupancy certificate. The responsible party must obtain an approval before the affected work begins. The Builder must not knowingly perform work contrary to an approval.

Each party remains responsible for duties imposed on it by applicable labour, building, safety, welfare and environmental law. The Builder must control the Site, provide required protective measures and records, and ensure its workers and subcontractors hold required registrations and licences. Nothing transfers a statutory duty from a person on whom the law places it.

3. Price and payment
The Owner must pay the Contract Price by the milestones in Schedule 2. The Builder's invoice must identify completed work, approved Variations, GST, statutory deductions and supporting measurements or certificates. Within [seven] Business Days after receipt, the Owner must pay the undisputed amount or give a written statement of each disputed item and reason. The Owner may withhold only a reasonable disputed amount.

GST, tax deduction at source and other statutory charges must be treated as stated in Schedule 2 and as law requires. Rights under the Micro, Small and Medium Enterprises Development Act 2006 remain available if the Builder is an eligible enterprise.

4. Variations
A Variation is valid only if a written document signed by authorised representatives states the changed work, price or valuation method, time effect and revised Completion Date. The Builder need not carry out a proposed change until those matters are agreed, except urgent work reasonably required to prevent imminent injury or material property damage. For urgent work, the Builder must notify the Owner promptly and keep contemporaneous records.

5. Programme and delay
The Builder must follow the programme in Schedule 1 and notify a likely delay within [three] Business Days after becoming aware of it, stating the cause, expected effect and mitigation. The Completion Date extends only to the extent delay is caused by an approved Variation, Owner default, an undisclosed physical condition not reasonably discoverable before signing, or an unavoidable event beyond the affected party's reasonable control. The Builder must mitigate delay.

If Schedule 2 states delay damages, they apply only to Builder-caused delay after the Completion Date at INR [amount] per day, capped at [percentage]% of the Contract Price, to the extent enforceable and not penal.

6. Completion and defects
When the Building is complete and fit for its stated use subject to required approvals, the Builder must request inspection. Within [five] Business Days, the Owner must issue a completion certificate or a reasonable list of incomplete or defective items. Minor items that do not prevent safe intended use do not justify refusal of completion.

The Builder must correct notified defects caused by its breach within a reasonable time during the [twelve]-month Defects Period beginning on completion. The Owner must allow reasonable access. Final payment or certification does not waive fraud, latent defects or rights that cannot lawfully be waived.

7. Materials, risk and insurance
Materials must conform to Schedule 1 and be new unless otherwise stated. Title to materials passes on the earlier of payment for them or incorporation into the Building, free of undisclosed charge. The Builder bears risk in the Works until completion except to the extent loss is caused by the Owner.

Before starting, the Builder must provide evidence of the policies in Schedule 3, including contractors' all-risk, worker and third-party liability cover where required. Each party must promptly notify an insured event. Insurance does not limit liability.

8. Suspension and termination
A party may suspend affected performance after [seven] Business Days' notice of a material breach that remains uncured. Immediate suspension is permitted for an imminent safety risk. A party may terminate if a material breach remains uncured [fifteen] Business Days after notice or the other party enters insolvency, subject to mandatory law.

On termination, the Builder must secure the Site and hand over paid-for work, materials and records. The Owner must pay for conforming work completed and reasonable demobilisation, less lawful set-off and reasonable completion cost caused by Builder default.

9. Liability and disputes
Each party is liable for direct loss caused by its breach, negligence or wilful misconduct. Neither party excludes liability for fraud, death or personal injury caused by negligence, or any liability that cannot lawfully be limited. Any liability cap in Schedule 3 does not apply to those matters, unpaid amounts or damage to third-party property.

Senior representatives must meet within [five] Business Days after a dispute notice. If unresolved after [ten] further Business Days, either party may bring proceedings. Indian law governs and, subject to mandatory jurisdiction rules, courts at [city, State/Union Territory] have exclusive jurisdiction.

10. General
The Builder may subcontract parts of the Works but remains responsible for them and may not subcontract the whole Works without consent. Changes other than Variations must be signed. Notices must be written and delivered by hand, tracked post or email, effective on proven receipt. Counterparts and valid electronic signatures may be used. The parties must complete applicable State or Union Territory stamp-duty and execution requirements.

SCHEDULE 1 — BUILDING, SITE AND PROGRAMME
Site and Owner's right to build: [details].
Building, drawings, specifications, finishes and exclusions: [details].
Programme, Completion Date and dependencies: [details].
Owner-supplied items and information: [details].
Approvals, inspections and responsible party: [details].
Testing and completion criteria: [details].

SCHEDULE 2 — PRICE AND PAYMENTS
Contract Price, GST and TDS: [details].
Milestones, amounts, measurements and evidence: [details].
Retention and release, if any: [details].
Delay damages, if agreed: [details].

SCHEDULE 3 — INSURANCE, LIABILITY AND CONTACTS
Policies, limits and period: [details].
Liability cap, if agreed: [details].
Authorised representatives and notices: [details].

SIGNATURES
For the Owner: [authorised signatory, position, signature and date].
For the Builder: [authorised signatory, position, signature and date].



---
License: Licensed under CC BY 4.0. Attribution is required when you publish or redistribute this Template or an adapted version to the public. Attribution is not required merely because you use or adapt the Template for your own business or legal purposes, including preparing, negotiating, signing, or exchanging an agreement with a counterparty. License details.